Similar Projects
Snow Removal Metra Lots
Term Contract
Sub-Bidding
Fox Lake, IL 60020

Woody Invasive Plant Clearing - Multiple Preserves
Term Contract
Sub-Bidding
Libertyville, IL 60048

2021 Unit Price Asphalt Materials Purchasing
Term Contract
Post-Bid
Highland Park, IL

Disposal Services
Term Contract
Post-Bid
Lincolnshire, IL

Miscellaneous Cutting Tools & Abrasives
Term Contract
Results

Aerial Spraying of Aquatic Glyphosate Herbicide
Term Contract
Results

Woody Invasive Plant Clearing - Middlefork Savanna
Term Contract
Sub-Bidding
Lake Forest, IL 60045

Water Meter Bid 2021-2023
Term Contract
Post-Bid
Waukegan, IL

Snow and Ice Control Services for the 2022-2023 Winter Season
Term Contract
Sub-Bidding
Round Lake, IL 60073

Board Up Services
Term Contract
Post-Bid
Waukegan, IL

Invasive Species Treatment, Prescribed Burn and Plug Planting - Greenbelt Forest Preserve
Term Contract
Sub-Bidding
North Chicago, IL 60064

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Job Order Contracting
Term Contract
Post-Bid

Process Chemicals Supply Services
Term Contract
Post-Bid
Gurnee, IL

Rebid Student Services and Adult Education Lakeshore Campus Furniture
Term Contract
Post-Bid
Waukegan, IL 60085

Last Updated 08/25/2022 09:03 AM
Project Title

2022 Fall/2023 Spring Tree Planting and Maintenance Plan

Physical Address View project details and contacts
City, State (County) Waukegan, IL 60085   (Lake County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Waukegan Park District reserves the right to waive technicalities, to accept or reject any or all bids, to accept only portions of a bid and reject the remainder. Owner will award the Contract to the lowest most responsible and responsive Bidder, as determined by Owner. In considering the Bidder's responsibility, the Owner may evaluate, among other factors, the ability of the Bidder to provide experienced labor sufficient in numbers to timely and properly complete the services, the financial capability of the Bidder, and the performance of the Bidder on other projects. Bids shall not include federal excise tax or state sales tax for materials to be incorporated in, or totally consumed in the prosecution of the Work. A tax exemption certificate will be furnished by the Park District at the request of the Bidder. The District's tax exemption number shall only be used by the successful Bidder for the Work of this Project. No bid may be withdrawn, and all bids shall remain firm for sixty (60) days after the bid opening. The Work of the 536 S. McAlister Flooring Project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. A prevailing wage determination has been made by the Park District, which is the same as that determined by the Illinois Department of Labor for public works projects in Lake County. The Contract entered into for the Work will be drawn in compliance with said law and proposals should be prepared accordingly and provide for payment of all laborers, workmen, and mechanics needed to perform the Work at no less than the prevailing rate of wages (or the prevailing rate for legal holiday and overtime work) for each craft, type of worker, or mechanic. The Contractor(s) selected will also be required to comply with all applicable federal, state and local laws, rules, regulations and executive orders, including but not limited to those pertaining to equal employment opportunity. State aw mandates an open and competitive bidding process and requires that publicly procured contracts be awarded to the lowest responsible and responsive bidder with no demonstrated preference based on the bidder's location, race and gender. Therefore, the Park District is unable to give preference to competitively bid projects, but does encourage submission from local, women, and minority bidders. All bids must be accompanied by cashier's check or bid bond payable to the order of the Waukegan Park District for ten percent (10%) of the amount of the bid as provided in the Instructions to Bidders. No proposals or bids will be considered unless accompanied by such bond or check.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents