Similar Projects
Birch and Mcdowell Water and Drain Improvement
Infrastructure
Bidding
$234,000 est. value
Ayer, MA

Installation of Meter Transmission Units
Infrastructure
Bidding
$185,000 est. value
Cambridge, MA

Furnish and Deliver Water Meters for FY21
Term Contract
Post-Bid
Ayer, MA

Wayland Water Materials
Post-Bid
Wayland, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Rehabilitation of WASM 3 Sections W11/W12/W16/51
Results
Less than $13,992,000 est. value
Arlington, Medford, Somerville, MA 02129

Replacement of Water Service Connections
Term Contract
Bidding
$1,000,000 est. value
Everett, MA 02149

Furnishing and Installation of Ductile Iron Water Main
Post-Bid
$250,000 est. value
Weston, MA

Water Meter Replacement, Repairs, Testing, and Maintenance
Results
Somerville, MA 02143

American Darling Hydrants
Post-Bid
Framingham, MA

2019 Water Distribution Improvements
Results
Less than $1,000,000 est. value
Arlington, MA

2021 Lead Service Line Replacement - Contract Two
Post-Bid
Malden, MA

North Street and Mt. Vernon Street Water Main Replacement
Results
Less than $2,500,000 est. value
North Reading, MA

2021 Lead Service Line Replacement - Contract One
Post-Bid
Malden, MA

FY2021 Water Main Replacements in Fletcher Road Gorham Road Hammond Road and Van Ness Road
Results
Less than $1,000,000 est. value
Belmont, MA 02478

Last Updated 02/11/2022 09:50 AM
Project Title

Pike Street and Astle Street Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Tewksbury, MA 01876   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the following major item (s): Installation of approximately 3,500 linear feet of 16”, 12”, 8” and 6” ductile iron water main, approximately 600 linear feet of copper water service piping, fittings, fire hydrants, ductile iron gate valves, and other related water system work on Pike Street and Astle Street. Additional work includes temporary and permanent trench paving of approximately 4,000 linear feet and all other related work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents