Similar Projects
Digester Gas Conditioning Improvements
Bidding
Dayton, OH

Elmore Elevated Tank Rehabilitation
Bidding
$221,375 est. value
Elmore, OH

Underground Storage Tanks at WPAFB, OH
Post-Bid
$10,000,000 to $25,000,000 est. value
Dayton, OH 45433

Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

DPU/DOSD/Surv Lab/ MB Tank
Results
Columbus, OH

Polyethylene and Fiberglass Stationary Liquid Storage Tanks
Term Contract
Results

2021-2023 North East Gas Main Replacement
Post-Bid
Lancaster, OH

SSO 700 STF Disinfection Improvements
Results
Less than $4,000,000 est. value
Cincinnati, OH

Facilities Maintenance Garage Fuel Tank Replacement
Post-Bid
Dayton, Vandalia, OH 45414

Gas Regulator SCADA Conduit Project
Results
Hamilton, OH 45011

Compressed Natural Gas (CNG) Fueling System Services
Results
Less than $546,400 est. value
Columbus, OH 43215

Jackson Pike Wastewater Treatment Plant - Facilities and Equipment Upgrade for Whittier Street Storm Tanks
Results
Columbus, OH 43215

Shawnee State Park Marina AST System Installation
Results
Less than $352,000 est. value
West Portsmouth, OH 45663

DOW/PAWP-Fluoride Tank Inspection, Repair or Replacement
Results
Columbus, OH

Commercial Propane-Liquefied Petroleum Gas Fuel and Storage Equipment
Results
Berea, OH 44107

Last Updated 12/18/2020 02:40 PM
Project Title

2021 Miscellaneous Gas Main

Physical Address View project details and contacts
City, State (County) Hamilton, OH   (Butler County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the improvements on which proposals are requested will require the installation of a gas main, as described below: 30 lineal feet of 4" polyethylene gas main, 480 lineal feet of 8" polyethylene gas main (piping provided by the City), 1,685 lineal feet of 8" polyethylene gas main to be directionally drilled, 90 lineal feet of 8" steel gas main to be removed through an existing casing, 90 lineal feet of 8" polyethylene gas main to be re-installed through the existing casing, and other miscellaneous items.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents