Similar Projects
Bldg. 592 Mezzanine Ventilation Design & Installation
Bidding
$500,000 to $1,000,000 est. value
Philadelphia, PA

Silverliner V HVAC Units
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

The Naval Foundry and Propeller Center (NFPC) 25/50 Ton Climate Changer Replacement
Post-Bid
Philadelphia, PA 19019

J--SDVOSB Set-Aside Replace Hot Coils, Valves, and Convertors at Philadelphia VA Medical Center
Results
Philadelphia, PA 191044551

Air Conditioner 10,000 Btu 120 V R410a
Results
Less than $25,000 est. value
Philadelphia, PA

Maintenance and Repair of Automatic Temperature Controls
Term Contract
Bidding
Philadelphia, PA

City Hall HVAC System Preventative Maintenance Services
Post-Bid
Philadelphia, PA 19107

HVAC Controls Replacement PHL ATCT
Results
$50,000 to $100,000 est. value
Philadelphia, PA

NAVFAC Building 2B HVAC Replacement
Bidding
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19111

Acquity Uplc H-Class System Air Management Services
Post-Bid
Philadelphia, PA

General HVAC Services (Maintenance and Repair)
Results
Philadelphia, PA 19102

Z2da--Site Preparation For Electrospinner
Bidding
$25,000 est. value
Philadelphia, PA

Ceiling Ventilator and Accessories
Post-Bid
Philadelphia, PA 19103

J--Air Balancing and Testing
Results
Philadelphia, PA 19104

Last Updated 12/30/2019 11:26 AM
Project Title

Cooling System Renovation at Port Administration Building

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Raceways and installation components Wire and Cable Panelboards Lighting and Distribution Fuses Safety and disconnect switches Service and Distribution equipment Motor controllers Emergency generators Manual motor starters Control equipment Control and alarm wiring system Grounding system Modifications to fire alarm system Modifications to the security system Testing Alternate pieces Furnishing and setting of all sleeves through floors, roof and walls where required, including waterproofing and fireproof sealing and cap flashing. Excavation and backfill (Excavation in rock shall be included) All concrete work for site lighting pole bases and patch work Hardware, such as inserts, bolts, etc., associated with concrete bases. Cutting, drilling and boring associated with electrical work. Prime painting, where required for electrical equipment and installation. Provisions for temporary light and power. Final connection of all equipment unless otherwise noted. Seismic restraints

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents