Last Updated | 10/02/2023 01:37 PM |
Project Title | Second Avenue Subway Phase 2, Utility Relocation and Building |
Physical Address | View project details and contacts |
City, State (County) | New York, NY 10029 (New York County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Misc. Structures, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Due to the sensitive nature of the project, reference documents will not be posted. Please obtain documents through the means listed in the invitation to bid. * DESCRIPTION: The Work of this Contract consists of utility relocation and building remediation/protection along Second Avenue, between 104th Street and 112th Street, as well as the cross streets, in the Borough of Manhattan, in preparation for the cut-and cover construction of the new 106th Street Station, for the Second Avenue Subway Project - Phase 2. The Work includes the following: maintenance and protection of traffic to support the construction and operations, including the relocation of Second Avenue bike lane onto First Avenue; removal, relocation/modification of street/sidewalk furniture and sidewalk encroachments such as traffic signals, street lights, street trees, sidewalk vaults, cellar doors, canopies, and stoops, as required to perform the work; installation and monitoring of instrumentation on buildings and surrounding area to monitor potential construction impacts to the existing buildings; strengthening, remediation and/or underpinning of specific buildings impacted by the utility relocation or future follow-on Contract work as shown in Contract Drawings; hazardous materials remediation, and relocation and construction of storm drain, sewer, water, electric, gas, telephone and other communication systems as required. This is an A + B Bidding Contract. Funding: 100% FTA Goals: 22.50% DBE Est $ Range: $50M- $100M Contract Term:1280 Days *Current addenda: 6* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |