Similar Projects
Roofing at Patterson Elementary School
Bidding
$1,100,000 est. value
Mesa, AZ 85208

BP Building 43A Areas 1 and 2 Roof Replacement - Mesa Community College
Bidding
$400,000 est. value
Tempe, AZ 85202

Discovery Elementary School Roof Rehabilitation
Post-Bid
$200,000 to $300,000 est. value
Glendale, AZ

Mechanical Work, Roof Repairs and Wood Flooring
Post-Bid
Ajo, AZ

Roofing Repair/Replacement at Cartwright Elementary School
Results
Phoenix, AZ 85035

Roofing Repair/Replacement at Bret R. Tarver Elementary School
Results
Phoenix, AZ

Job Order Contracting for Roofing Services
Term Contract
Post-Bid
Phoenix, AZ

Roof Repair Chinle Indian Health Service
Results
Chinle, AZ 86503

Tuba City Regional Health Care - Roofing Project
Post-Bid
Tuba City, AZ

Roof Replacement PHX ARSR- Near Phoenix Arizona at Humboldt Mountain
Results
$80,000 to $125,000 est. value
Humboldt, AZ

Roof Rehabilitation Tempe Center for the Arts
Post-Bid
Tempe, AZ 85281

Cholla WTP Administration Building Roof Replacement
Results
Glendale, AZ

Z--Roof Replacement
Post-Bid
$100,000 to $250,000 est. value
Sells, AZ 85634

Frontier Village Roof Repairs Phase 2
Results
Prescott, AZ

Metal Pro Panel Roof Replacements
Post-Bid
Chinle, Fort Defiance, Page, Tuba City, Window Rock, AZ - Crownpoint, NM

Reported 05/30/2019 12:00 AM
Project Title

Roof Replacement/Repair Project

Physical Address View project details and contacts
City, State (County) Chinle, AZ   (Apache County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Navajo Nation Division of Behavioral and Mental Health Services Chinle Outpatient Treatment Center is in need of a roof covering replacement of existing rolled roofing of approximately 11,772 s.f., and an evaluation and repairs to existing pro panel sections of the roof. 1. Remove existing rolled roofing material, fasteners and underlayment. 2. Prepare the exposed roof material to accept the new roofing material. 3. Install approximately 11,772 s.f. “TPO” roofing material. 4. Contractor is responsible for field verifying measurements 5. Inspect existing pro panel metal roofs on all areas. 6. Repair and areas of concern of the existing pro panel roofing. 7. Contractor must provide product cut sheets and specifications 8. Extended warranty for workmanship, parts, and repairs.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents