Similar Projects
Last Updated | 11/30/2018 11:28 AM |
Project Title | Health First Medical - Data Center's Critical System |
Physical Address | View project details and contacts |
City, State (County) | Melbourne, FL 32901 (Brevard County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | |
Project Status | Construction Commenced November 2018 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Addition of 300kw standby generator ATS and 2 Mechanical units to roof. Description of work: The Gateway Critical Systems Project consists of upgrades to the critical systems for the data center at Health First Gateway Medical Center facility. The project provides redundant cooling to the existing data center's cooling system and an uninterruptable power supply (UPS) and Generator to provide uninterruptable backup power. The new redundant cooling system consists of two 16 ton Computer Room Air Conditioning (CRAC) units. The CRAC units shall be tied into the existing data centers cooling system to provide backup cooling if the existing cooling systems fails. The generator and UPS will provide backup power to the redundant cooling system. The new generator and new UPS in conjuncture with the existing generator and UPS will provide a N+1 redundancy for the data center. If the utility power and the existing generator and UPS fails the New UPS and Generator shall backup the data center. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |