Similar Projects
Replace Chiller Bldg 1317
Bidding
Patrick AFB, FL 32925

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Surfside Elementary School HVAC Upgrade
Post-Bid
Satellite Beach, FL

AC Replacement for Laboratory Services - Blue Heron Administration Building
Results
Less than $15,000 est. value
Titusville, FL 32780

King Center HVAC Renovation
Results
$161,500 est. value
Melbourne, FL

AC Install Mitchell Street
Post-Bid
Melbourne, FL

HVAC Replacement of VAV Boxes Palm Bay Service Center
Results
Less than $15,500 est. value
Palm Bay, FL

Construct HV Duct Bank, Trident MACA
Post-Bid
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

HTCH Chilled Water Piping Replacement
Results
$275,000 est. value
Titusville, FL

Replace AC Unit at the M.D. Water Plant
Post-Bid
Titusville, FL 32796

Heating, Ventilation and Air Conditioning (HVAC) Replacement for the North Region
Results

BPS Longleaf Elementary School Chiller
Post-Bid
Melbourne, FL 32935

Heating, Ventilation and Air Conditioning (HVAC) Replacement - South Region
Results

FDOT HVAC Install: Sneads WB Weigh Station
Results

IDIQ JOC HVAC Phase 2
Results
Less than $500,000 est. value

Last Updated 11/30/2018 11:28 AM
Project Title

Health First Medical - Data Center's Critical System

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32901   (Brevard County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Construction Commenced November 2018
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Addition of 300kw standby generator ATS and 2 Mechanical units to roof. Description of work: The Gateway Critical Systems Project consists of upgrades to the critical systems for the data center at Health First Gateway Medical Center facility. The project provides redundant cooling to the existing data center's cooling system and an uninterruptable power supply (UPS) and Generator to provide uninterruptable backup power. The new redundant cooling system consists of two 16 ton Computer Room Air Conditioning (CRAC) units. The CRAC units shall be tied into the existing data centers cooling system to provide backup cooling if the existing cooling systems fails. The generator and UPS will provide backup power to the redundant cooling system. The new generator and new UPS in conjuncture with the existing generator and UPS will provide a N+1 redundancy for the data center. If the utility power and the existing generator and UPS fails the New UPS and Generator shall backup the data center.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Operation and Maintenance of HVAC Systems, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Central Cooling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents