Similar Projects
Collective at Canton
New Construction - 90,800 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Baltimore, MD 21224

South Lake Development - Master Plan
New Construction - 5,272 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bowie, MD 20715

Marriott Hotel and Conference Center
New Construction, Renovation, Demolition - 24,000 SF
Design
$84,000,000 est. value
Frederick, MD 21701

Mount Vernon District Eager Street Mixed Use Building
New Construction, Alteration
Design
$35,000,000 est. value
Baltimore, MD 21201

Walter P. Carter Pool & Bathhouse
Renovation - 760 SF
Bidding
$2,250,000 CJ est. value
Baltimore, MD 21212

Ambrose Kennedy and Patterson Park Pool Renovations
Infrastructure
Bidding
$2,200,000 CJ est. value
Baltimore, MD 21202

South Lake - Multi-family Phase
New Construction - 8,363 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Bowie, MD

Aydelotte Villas and Clubhouse
New Construction - 5,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Salisbury, MD 21804

ASC Renovation Phase 4
Results
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Pool Repair at Walkersville High School
Alteration
Results
Walkersville, MD 21793

Harbor East Residential Tower
New Construction
Construction
$100,000,000 est. value
Baltimore, MD 21202

LA Fitness
New Construction - 34,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
nottingham, MD 21236

Cross Keys Multi-Family Building
New Construction - 500,000 SF
Pending Verification
$10,000,000 CJ est. value
Baltimore, MD 21210

Garden City Drive Multi Family
New Construction
Pending Verification
Hyattsville, MD 20785

Village Of Cross Keys - Apartments
New Construction
Conception
Baltimore, MD 21270

Last Updated 10/03/2022 12:02 PM
Project Title

Renovate Pool House

Physical Address View project details and contacts
City, State (County) Snow Hill, MD 21863   (Worcester County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $840,762 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 3, 2022, the project has not been awarded. A timeline for award has not been confirmed. Project Cost Class C - $500,000 to $1,000,000 The project is (1) to renovate existing bathrooms - both Men and Women. Total existing building area is approx. 2765 SF. All existing toilet fixture, accessories (including hand dryer) and plumbing shall be replaced with new. The existing concrete slab shall be replaced with new concrete. All areas shall meet ADA 2010 requirements. The new wall shall be metal studs 8' high. The existing skylights will be replaced with Solatube. The entire bathroom shall have new LED light fixtures and new exhaust system. The existing louvers which will stay will receive new insect screen. Both bathrooms will receive new ceiling mounted fan. The existing water heater located inside the Mechanical Room shall be replaced with new tankless water heater and add as needed by the design; (2) The existing entrance vestibule shall have aluminum storefront entrance system after removing existing chain link fence/gate and prefab booth; (3) The existing A/C unit in the existing office room shall be replaced with a ductless unit with heating and air-conditioning system; (4) Emergency Eye wash shall be installed in the filter equipment room; (5) Exterior light fixture above entrance will be replaced with LED; (6) Existing electrical panelboard shall be replaced with S/S cabinet; (7) Existing speaker and associated speaker amplifier shall be removed. All call paging system (1 Zone, no call back, no intercom) with 2 exterior speakers shall be provided; (8) New suspended acoustical ceiling tile shall be provided in both bathrooms and office; (9) The existing asphalt shingles shall be removed in its entirety and provide architectural shingles per DNR requirements and section 073113 (Color will be selected by DNR); (10) Some of the existing louvers shall be converted to a fixed aluminum window; *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The MBE subcontracting participation goal for this solicitation is: 15% (No Split) The VSBE subcontracting participation goal for this Solicitation is: 0% The work shall be completed within 150 calendar days from the start date of the contract. If the work is not completed within the time period specified, the contractor will be liable for liquidated damages of $550.00 per calendar day as specified in the "General Conditions." The deadline for questions has been established as April 4, 2022 @ 2:00 p.m., to ensure that there is enough time to allow for the A/E to provide responses and possible Addendum issuance if necessary. Prevailing wage rates apply to all contracts in the amount of $250,000 or more. Wage rates applicable to projects of $250,000 or more are attached to the specifications.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents