Similar Projects
Z--Provide Cyclic Maintenance to Preserve the Historic Province Lands Visitor Center
Design
Provincetown, MA 02657

Roll In Shower Unit 39
Bidding
$22,600 est. value
Adams, MA

Penthouse Walls Remediation, Meier Hall, General Bid
Alteration
Bidding
$810,500 est. value
Salem, MA 01970

SLE - Control Cabinets / Panel Assemblies
Term Contract
Post-Bid
Boston, MA

Grand Avenue Stairway Repair
Post-Bid
Less than $17,000 est. value
Millers Falls, MA

12 Channel Street Operations Center - General Bid
Results
Less than $1,996,916 est. value
Boston, MA

Roof and Wall Panel Replacement at the 89 Bancroft Street Maintenance Depot - General-Bid
Results
Less than $844,000 est. value
Auburn, MA 01501

RFQ - Trade Contractor Prequalification - Bid Package #2 Sitework and Concrete, Oliver Partnership School Renovation & Addition
Alteration
Bidding
$19,700,000 est. value
Lawrence, MA 01840

QCC Administration Building Dental Clinic Glazed Screen System Installation Project
Post-Bid
Less than $28,000 est. value
Worcester, MA 01606

On-Call Spray on Acoustical and Thermal Insulation Contractors
Term Contract
Results
Less than $100,000 est. value
Quincy, MA

Agawam Public Library Selected Drywall Removal
Alteration
Bidding
$12,000 est. value
Agawam, MA 01001

On Call Board and Plastering City Wide
Post-Bid
Quincy, MA 02169

Curley Community Center Renovation - Sub-Bids
Results
Less than $21,900,000 est. value
Boston, MA

Roofing Insulation: Colonial Gardens
Alteration
Bidding
$84,450 est. value
Lynnfield, MA 01940

Muraco Elementary School Casework Replacement
Post-Bid
Less than $110,000 est. value
Winchester, MA 01890

Last Updated 12/08/2021 09:26 AM
Project Title

Bathroom Renovations, New Emerald Lane 705-1

Physical Address View project details and contacts
City, State (County) Wrentham, MA 02093   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,289
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Removal and replacement of existing tubs, faucet, controls, showerhead and drain assemblies, vinyl flooring and underlayment and associated work in two second floor bathrooms. Also ceiling repair in first floor living room. Add Alternate 1 includes removal and replacement of vanity, sink, faucet and medicine cabinet and painting walls, ceiling and trim in both bathrooms.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents