Similar Projects
Boulder Farms
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Berlin Township, OH 43015

Glen Cannich Village
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Delaware, OH 43015

Nocterra Brewing / Audubon Park
New Construction, Infrastructure
Design
$900,000 CJ est. value
Columbus, OH 43215

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

New City of Columbus Fire Station #36
New Construction, Infrastructure - 25,000 SF
Post-Bid
$12,700,000 CJ est. value
Blendon Township, OH 43081

Replacement of the Scioto Township Hall Parking Lot
Alteration
Post-Bid
$700,000 est. value
Ostrander, OH 43061

2021 Water Main Repairs
Infrastructure
Results
Columbus, OH

Mainline Pipes, Valves and Boxes UTC
Infrastructure
Results
Columbus, OH

The Goddard School / Delaware
New Construction, Infrastructure - 13,075 SF
Construction
$3,000,000 CJ est. value
Delaware, OH 43015

Germain Volkswagen / Westerville
New Construction, Infrastructure - 26,000 SF
Pending Verification
$6,900,000 CJ est. value
Westerville, OH 43081

RFQ Design - Innovation District Sewer and Water Extension
Infrastructure
Pending Verification
$19,200,000 CJ est. value
Columbus, OH 43215

Jaycee Arms Apartments Addition
New Construction, Infrastructure
Design
$33,500,000 CJ est. value
Columbus, OH 43215

Delaware Municipal Airport Apron B Rehabilitation
Infrastructure
Bidding
$375,000 CJ est. value
Delaware, OH 43015

Sawmill Parkway Materials Procurement
Infrastructure, Alteration
Post-Bid
Delaware, OH

Last Updated 03/14/2023 02:03 PM
Project Title

Worthington Arms Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Lewis Center, OH 43035   (Delaware County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of approximately 7,500+ LF of 6 and 8 diameter cured-in-place pipe, including but not limited to, 3,100+ LF of 4 PVC laterals, new manholes, restoration, and all appurtenances as detailed in plans (6 sheets), and the project manual prepared by UMH Properties, Inc. The site is located at 5277 Columbus Pike, Lewis Center, OH in Delaware County. As of March 14, 2023, a general contractor has been awarded. All subcontract trades have been let. Construction is expected to start April 2023. Work must be completed within 270 calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents