Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Construction Services for Poitras East Community Development District
Post-Bid
FL

Stormwater Drainage Expertise Lakewood Ranch Inter-District Authority Community Development District 5
Post-Bid
Lakewood Ranch, FL 34202

Storm Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Technology
Results
Less than $304,580 est. value
Jacksonville, FL

Y--IGF::OT::IGF RV Work Camp Sewer Connection
Results
Less than $25,000 est. value
Big Pine Key, FL

Stormwater Improvements
Construction
Lake City, FL 32055

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Plugged Storm Drains
Results
Everglades, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

East College, East Jefferson & South Meridian Streets Water and Sewer Improvements
Results
Less than $2,739,200 est. value
Tallahassee, FL

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Pre-Cast Storm Water Control Stuctures
Results
Kissimmee, FL 34741

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Last Updated 10/06/2020 11:20 AM
Project Title

Sanitary Sewer Lift Stations: Rehabilitation, Repair and Replacement

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL   (Saint Johns County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Wharton-Smith, Inc. is the City's Construction Manager at Risk (CMAR) for the project. It is a phased project, comprised of thirteen (13) lift stations in two (2) phases. This phase includes replacement of three (3) lift stations (LS 4, 5 21) and rehabilitation of seven (7) lift stations (LS 6, 7, 10, 11, 22, 23 24). The work is separated into the six (6) Bid Manuals listed below; Equipment Bid Manuals: 1. Control Panel Bid Manual Control panel procurement for all thirteen (13) lift stations. 2. Submersible Pump Bid Manual Submersible centrifugal sewage pump procurement for all thirteen (13) lift stations. 3. Back-Up Diesel Pump Bid Manual Procurement of nine (9) diesel engine driven bypass pumps. Installation Bid Manuals: 4. Multiple Lift Station Contractor Bid Manual Installation of mechanical, concrete, dewatering, bypass pumping, MOT, landscape, and civil site improvements at ten (10) lift stations. 5. Electrical Contractor Bid Package Installation of control panels provided by CMAR, plus electrical and instrumentation work at ten (10) lift stations. 6. Remote Telemetry Contractor Bid Manual Installation of remote telemetry units and SCADA communication integration at ten (10) lift stations.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents