Similar Projects
Juniper Ridge Public Works Administration, Lab, and Warehouse - FA25AX - City of Bend
New Construction, Infrastructure
Conception
$48,804,000 CJ est. value
Bend, OR 97703

Pool Deck Re-Surface - City of Forest Grove
Infrastructure
Conception
$250,000 CJ est. value
Brothers, OR 97712

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

US97: Multi-Use Trail (Baker Rd. - Lava Butte)
Infrastructure
Design
$4,677,000 CJ est. value
Bend, OR 97707

Sam Johnson Park & Valleyview Park - Tennis and Pickleball Court Rehabilitation
Infrastructure
Bidding
$150,000 CJ est. value
Redmond, OR 97756

L-Lateral Piping Project
Infrastructure
Bidding
$600,000 CJ est. value
Redmond, OR 97756

Cooley Talus Road Extensions
Infrastructure
Post-Bid
$2,800,000 CJ est. value
Bend, OR 97703

Cooley Talus Road Extensions
Infrastructure
Post-Bid
$2,800,000 CJ est. value
Bend, OR 97703

Region 4 Arts
Infrastructure
Results
$3,333,633 CJ est. value
La Pine, OR 97739

J-Lateral Piping Project
Infrastructure
Results
$1,837,294 CJ est. value
Redmond, OR 97756

Student Success Center - Oregon State University-Cascades
New Construction, Infrastructure - 22,500 SF
Pending Verification
$18,800,000 CJ est. value
Bend, OR 97702

New Stevens Ranch Library - Deschutes County
New Construction, Infrastructure
Pending Verification
$113,000,000 CJ est. value
Bend, OR 97703

Brosterhous and Chase Intersection - 1TCHI - City of Bend
Infrastructure
Conception
$1,000,000 CJ est. value
Bend, OR 97702

US 97: Lower Bridge Way - NW 10th St (Terrebonne)
Infrastructure
Design
$22,600,000 CJ est. value
La Pine, OR 97739

Oasis Village Utility Crossing Construction Plan
Infrastructure
Bidding
$350,000 CJ est. value
Redmond, OR 97756

Last Updated 07/25/2023 06:31 AM
Project Title

Water Reclamation Facility (WRF) Primary Clarifier Rehabilitation

Physical Address View project details and contacts
City, State (County) Bend, OR 97701   (Deschutes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,645,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the rehabilitation of two primary clarifiers at the Water Reclamation Facility. This includes demolition, removal, and replacement of sludge collecting mechanisms, access bridges, weirs and baffles, spray water system, mechanical drive, electrical conduits, light poles, control panels, and other equipment. Concrete floor rehabilitation and spot repairs on the existing launder walls are also part of the project. Questions Due Date: Jul 17th 2023, 4:00 PM PDT *The value for this project is based on a financial range. The Engineer's estimate is between $2,070,000 and $2,645,000. The Project Manager for this project is: Dade Pettinger, Engineering Associate. Any questions regarding the bid documents should be submitted to the Issuing Officer only via the City's Portal. Description of Project: The scope of work includes, but is not limited to, the rehabilitation of two primary clarifiers located at the WRF, which is located Northeast of the City. For each clarifier, the Project involves demolition and removal of existing sludge collecting mechanisms and appurtenances, access bridges, including stairs and handrails, weirs and baffles, spray water system, mechanical drive, electrical conduits/associated wiring, light poles, and control panels. New components to be installed will generally include new sludge collector mechanisms and appurtenances, access bridges including stairs and handrails, weirs and baffles, spray water system, mechanical drive, electrical conduits/associated wiring, light poles, control panels and other ancillary equipment required for a complete system. The existing concrete floor of each clarifier will also be rehabilitated along with concrete spot repairs on the existing launder walls of both clarifiers. The Engineer's estimate is between $2,070,000 and $2,645,000. Location of Project: The project is located at the City's Water Reclamation Facility, 22395 McGrath Road, Bend, OR 97701 Purpose of Project: Purpose of project is to extend the useful life of Primary Clarifiers 1 and 2. The existing equipment has reached the end of its useful life and will be replaced to ensure continual operation of the clarifiers.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents