Similar Projects
Tampa Union Station RTU-7 AC Replacement
Post-Bid
Tampa, FL 33602

Replace Air Conditioning Unit at Parks Administration Building
Post-Bid
Plant City, FL 33563

FDOT HVAC Install: Sneads WB Weigh Station
Results

HVAC Direct Digital Control System Service
Term Contract
Results
Less than $55,000 est. value
FL

RTU-2 Rooftop Unit Installation, TSS Building E
Post-Bid
Tampa, FL 33605

HVAC System and Repair (Supplemental Vendors)
Term Contract
Results
Less than $5,000 est. value
Tampa, FL 33601

HVAC Cooling Tower Replacement
Post-Bid
Tampa, FL 33600

Furnish and Install AC Units at Utilities Administration Building
Results
Plant City, FL

Airside F Air Handler Replacement
Post-Bid
Tampa, FL 33607

Citywide HVAC Services
Term Contract
Results
Tampa, FL 33602

Hvac Preventative Maintenance Services
Post-Bid
Clewiston, Fort Pierce, Hollywood, Immokalee, Naples, Okeechobee, Tampa, FL 33024

4420--Supply: Repair Heater Exchanger Repair and Installation
Results
Tampa, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

J065--FY-20 Chiller Maintenance at the James A. Haley Vetrans Hospital Tampa FL
Results
Tampa, FL

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Reported 09/09/2020 12:00 AM
Project Title

HVAC Redundancy at Palm Terrace Assisted Living Facility and Adult Day Care Facility

Physical Address View project details and contacts
City, State (County) Tampa, FL 33617   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide for the design and installation of equipment necessary to provide for HVAC redundancy at the Tampa Housing Authority Palm Terrace Assisted Living Facility and Adult Day Care located at 5121 Serena Drive, Tampa, FL 33617-4032. The project shall be designed using natural gas fired heat pump (GHP) condensing units coupled with refrigerant to water heat exchangers (AWS). Either the existing chiller system or the proposed GHP/AWS system shall be able to be the primary source of cooling. The proposed equipment shall have the performance and specifications as described in the following sections. The basis of design shall be (6) 15-ton natural gas heat pump condensing units connected via refrigerant line to (6) 15-ton refrigerant to water heat exchangers for a total capacity of 120 tons. The heat exchangers shall be placed on a building chilled water supply manifold and connected to the main chilled water loop with valves in order to provide the ability to choose to either the natural gas chilled water equipment to provide the required chilled water to the facility, or, the existing electric water chiller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents