Similar Projects
Earl Newhouse Waterfront Improvements
Infrastructure
Bidding
$456,000 est. value
Canton, MA

Riverbend Park Engineered Barrier Off Freedom Way
Infrastructure
Bidding
Medway, MA

Repairs to Existing Memorial School ADA Entrance Ramp
Post-Bid
Medway, MA 02053

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Scheduled and Emergency Guardrail and Fence Repairs and Improvements at Various Locations
Results
Less than $174,000 est. value

Sidewalk and ADA Repairs and Improvements at Various Locations
Results
Less than $714,000 est. value

Pointe Place Parking
Pending Verification
Dover, MA

Trenton Road Playground - Boardwalk Project
Infrastructure
Bidding
Dedham, MA 02026

Sidewalks and Curbing Installation and Replacement
Post-Bid
Less than $200,000 est. value
Wellesley, MA 02481

Scheduled and Emergency Fence Repairs and Improvements at Various Locations
Results
Less than $260,000 est. value

Roadway Paint and Markings
Infrastructure
Bidding
$4,985,193 est. value
Boston, MA

Constructing and Repairing Cement Concrete Surfaces
Term Contract
Post-Bid
Less than $85,000 est. value
Franklin, MA

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,914,469 est. value

Remove 8 Existing Stamped Asphalt Crosswalks with Vertical Granite Curbing
Infrastructure
Bidding
$70,000 est. value
Randolph, MA

Miscellaneous Traffic Painting
Post-Bid
Weymouth, MA

Reported 09/09/2021 12:00 AM
Project Title

Rehabilitation to the Existing Timber Eastern and Southern Piers

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $870,456
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of but not limited to rehabilitation to the existing timber Eastern and Southern Piers, installation of a new sheet pile bulkhead and demolition of an existing concrete retaining wall, installation of a new access platform, installation of new access ramps.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents