Similar Projects
Guide Rail Repair - Berks/Lehigh/Northampton
Infrastructure
Sub-Bidding
$3,898,734 CJ est. value
Wyomissing, PA 19610

Guide Rail Repair - Berks/Lehigh/Northampton
Infrastructure
Sub-Bidding
$3,898,734 CJ est. value
Wyomissing, PA 19610

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Act 152 Demolition - North Braddock
Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Braddock, PA 15104

Asbestos Abatement - Reading School District Administration Building - 1st and 2nd Floors
Alteration
Post-Bid
Reading, PA 19601

Additions and Alterations to Fairview High School - Asbestos Removal
Results
$44,200 est. value
Fairview, PA 16415

Blawnox - Water Valve Replacement
Infrastructure
Sub-Bidding
$105,000 CJ est. value
Blawnox, PA 15238

Asbestos Abatement, Structure Demolition, and Site Restoration
Demolition, Infrastructure, Alteration
Post-Bid
Fairview, PA 16415

Asbestos Abatement Project at Wyomissing Area Junior/Senior High School
Alteration
Results
Wyomissing, PA 19610

Tree Removal Services
Term Contract
Sub-Bidding
Doylestown, PA 18901

Asbestos Containing Materials Abatement at Valley View Terrace Apartment Complex
Alteration
Post-Bid
Scranton, PA 18505

Asbestos Abatement, Environmental Cleanup and Re-Insulation Work at SLA Middle School at Beeber - General
Alteration
Results
$302,000 est. value
Philadelphia, PA 19131

Last Updated 10/08/2022 03:02 AM
Project Title

Pump Station Demolition Project

Physical Address View project details and contacts
City, State (County) Media, PA 19063   (Delaware County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pump Station Demolition Project The Owner reserves the right to waive any informalities or to reject any or all bids or parts thereof. The Owner reserves the right to award the contracts in whole or in parts. Each bidder must deposit with their bid, on the form provided, security in the amount and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract (The Pennsylvania Prevailing Wage Act 43 P. S. 165-1 - 165-17). Paper bids will not be accepted for this Project. Bidders will be required to submit with their bid a Qualification Statement to the Middletown Township Sewer Authority. Forms are contained in the Specifications, and bids will be accepted only from Bidders who have submitted this form in accordance with the Information for Bidders. Bidders will be required to comply with the provisions of the aEURoePublic Works Contractors Bond Law of 1967 of the Commonwealth of Pennsylvania, Act 385 of 1967, P.L. 869; 8 P. S. A191 et seq. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents