Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Cuyahoga Hills Juvenile Correctional Facility HVAC Replacement
Bidding
$915,000 est. value
Highland Hills, OH 44128

HVAC Technical Services for Forced Air Furnaces
Term Contract
Bidding
Cleveland, OH

Public Auditorium Music Hall Air Handling Units
Post-Bid
Cleveland, OH 44114

King Kennedy North Day Care HVAC Repair or Replacement
Post-Bid
Cleveland, OH 44104

USCG HVAC Maintenance and Repair Ohio
Results
Cleveland, OH 44114

Steam Humidification System Repairs & Replacement of Cooling Tower Fill Project
Results
$250,000 to $500,000 est. value
Cleveland, OH 44113

HVAC Improvements and Upgrades
Post-Bid

HVAC/R Supplies, Items, Materials and Parts
Results
Cleveland, OH 44114

Lubrizol Brecksville - Idea Center Boiler
Renovation
Post-Bid
Brecksville, OH 44141

HVAC System Replacement - City Hall
Results
$550,000 est. value
North Olmsted, OH 44070

RFI Only - NASA Glenn Research Center 9x15 Wind Tunnel Heat Exchanger Bundle Replacement
Post-Bid
Cleveland, OH 44135

HVAC Maintenance Services
Results

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

Recreation Center - Lobby and Gym HVAC Modifications
Results
Less than $210,000 est. value
Cleveland, OH 44115

Last Updated 12/19/2019 03:25 PM
Project Title

District-Wide HVAC Equipment and Systems Upgrades (1585)

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44115   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of rehabilitation, replacement and upgrades to HVAC equipment at the Easterly WWTP, Southerly WWTP, Westerly WWTC and at EMSC. The work generally consists of the following major equipment and associated electrical, piping, controls, ductwork and accessories per contract drawings and specifications: - Replacement and upgrades of 4 air handling units - Replacement and upgrades of 6 make-up air units - Replacement and upgrades of 4 heating and ventilating units - Replacement and upgrades of 5 roof top HVAC units - Replacement of 5 condensing units - Replacement of 4 steam heating coils - Replacement of 28 exhaust and supply fans - Installation of 7 VRF heating and air conditioning units - Installation of 18 variable air volume terminal units - Replacement and upgrades to 3 intake and relief hoods - Modification and upgrades to 1 air handling unit - Replacement of flue ductwork from 1 air handler

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents