Similar Projects
Secondary Water Filter Modifications
Bidding
Payson, UT 84651

Mapleton City Street Rehabilitation Project 2021
Bidding
Mapleton, UT

Water Line at Vernal Memorial Park
Post-Bid
Vernal, UT 84078

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

Construction of the 2019 Fire Flow Projects
Results
UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Decommissioning Water Systems
Results
$50,000 to $100,000 est. value
Price, UT 84501

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

Water Line Pipe and Fittings
Post-Bid
Provo, UT

2019 Public Works Project
Results
Hyrum, UT 84319

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Last Updated 04/06/2020 11:37 AM
Project Title

La Verkin Pipeline Replacement Project

Physical Address View project details and contacts
City, State (County) Saint George, UT 84770   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of the removal and disposal of approximately 1,920 linear feet of existing 15” plastic irrigation pipe, the installation of approximately 1,920 linear feet of 18” ductile iron pipe with associated fittings, one (1) air/vacuum valve assembly, and asphalt removal and replacement. The project is in the Trail Ridge Estates Subdivision in Toquerville, Utah. The owner is furnishing the 18” ductile iron pipe, fittings and air/vacuum assembly. The contractor will be responsible for disposal of removed pipe, asphalt, and construction debris.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents