Similar Projects
East Avon Road Early Works - 96-inch Water Transmission Main Relocation: 01.TC.001
Infrastructure
Bidding
$2,000,000 est. value
Detroit, MI 48223

2022 Sidewalk and Street Repair Program
Infrastructure
Bidding
$50,000 est. value
Plymouth, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

DDA Riverfront Property: Design-Build Seawall Reconstruction
Results
Detroit, MI 48226

Van Buren DDA Sidewalk Repairs
Results
Less than $175,000 est. value
Belleville, MI

2022 Louis Savage Garfield Park Drainage and Street Improvements Project
Infrastructure
Bidding
$600,000 est. value
Wayne, MI 48184

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

Installation of Asphalt Walking Track at Jefferson Elementary School Project
Results
Redford, MI 48239

Three (3) Surface Parking Lots for the CJC
Infrastructure
Bidding
$300,000 est. value
Detroit, MI

DFD Training Lot Renovation
Renovation, Infrastructure
Post-Bid
Detroit, MI 48234

2021/2022 Sidewalk and Concrete Repair Program Water Main Breaks
Results
Livonia, MI

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

2021-2022 Street And Sidewalk Repair
Results
Dearborn Heights, MI

Drainage System Cleaning
Infrastructure
Post-Bid
MI

Last Updated 05/16/2022 06:12 AM
Project Title

Waterfront Public Recreation Project in Pepper Park

Physical Address View project details and contacts
City, State (County) Ecorse, MI 48229   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work Concrete sidewalk improvements, river bank restoration and erosion control including but not limited to riprap, root wads, and rock vanes. The project also includes signage and landscaping.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents