Similar Projects
Town Hall Restoration Project
New Construction
Bidding
Palmer Lake, CO

GWS Courthouse Elevator Addition
Addition
Bidding
Glenwood Springs, CO 81601

Justice Center Locker Room Remodel Project
Renovation - 3,635 SF
Post-Bid
Castle Rock, CO 80109

Judicial Restrooms ADA Renovation
Renovation
Post-Bid
Colorado Springs, CO

Owners Rep / Construction Manager for City Hall Remodel Project
Renovation - 32,900 SF
Results
Less than $575,000 est. value
Wheat Ridge, CO 80033

Police Annex Remodel
Renovation - 3,260 SF
Results
Less than $290,714 est. value
Canon City, CO 81212

Centennial Courtroom Addition/Remodel
Addition - 7,425 SF
Construction
$1,000,000 to $1,500,000 est. value
Greeley, CO 80631

Exterior and Interior Renovation
Renovation - 51,495 SF
Construction
Telluride, CO 81435

Moffat County Courthouse
Renovation - 94,602 SF
Pending Verification
$25,000,000 est. value
Craig, CO 81625

Mesa County Bridger Building Renovation
Renovation
Post-Bid
Grand Junction, Grand Lake, CO 81501

Office Remodel North Campus Ih-19035/B6 & B10
Results
Less than $75,000 est. value
Denver, CO

Construction Manager Services for the New Archuleta County Combined Courts Facility
New Construction - 17,000 SF
Construction
CO

Town Hall Remodel Project
Renovation
Post-Bid
Avon, CO 81620

Justice Services Remodel
Renovation
Results
$500,000 to $600,000 est. value
Greeley, CO 80631

Headquarters Remodel
Renovation - 8,250 SF
Construction
Aurora, CO 80018

Last Updated 01/27/2020 04:28 PM
Project Title

Lindsey Flanigan Courthouse Courtroom Buildouts

Physical Address View project details and contacts
City, State (County) Denver, CO 80204   (Denver County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results, Construction Start Expected February 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $3,449,545 to $3,812,655
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Lindsey Flanigan Courthouse (“the Courthouse”) Courtroom Buildouts will include the construction of new courtrooms, jury deliberation rooms with restrooms, judge’s chamber with restrooms, holding areas including cells, visitation rooms, and conference rooms all within existing shell spaces inside the Courthouse. These shell spaces include much of the infrastructure for mechanical, electrical, and plumbing systems. Limited demolition will be required as a result. Furniture, fixtures, and equipment (FF&E) composed of audio visual and network systems as well as furniture will also be included. Each courtroom will require custom millwork and acoustic wall treatments. Prequalification Category: 2B-General Building Occupied Buildings OR 2C-Active High Security Facility Renovation - $6,000,000 The Courthouse is a secure facility that includes holding cells throughout. As a result, this will require background checks of employees (which will include all employees from all contractors working on site), special planning for unique day-to-day access and operations requirements onsite, and maintaining a safe and secure worksite. The Courthouse will also remain open throughout the performance of the work with court proceedings occurring Monday through Friday. To avoid disruption, the working hours for all of the work will be between 18:00 and 06:00 Monday through Friday. There is no access to free parking onsite. Space for deliveries, and unloading of materials is available but limited. There are limited possible staging and storage areas for materials and equipment on the 4th and 5th floors of the Courthouse.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents