Similar Projects
Justice of the Peace Courts
New Construction
Conception
Midland, TX 79701

Constable Offices
New Construction
Conception
Midland, TX 79701

Construction of A City Hall/Community Center
New Construction
Design
Kountze, TX 77625

Public Works Building
New Construction
Design
$3,000,000 est. value
Kountze, TX

Media Production Studio Alterations
New Construction, Renovation, Infrastructure
Bidding
$750,000 CJ est. value
Allen, TX 75013

Lake Jackson City Hall Restroom Renovation
Renovation - 700 SF
Bidding
$210,000 CJ est. value
Lake Jackson, TX 77566

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Post-Bid
$95,000,000 CJ est. value
McKinney, TX 75069

Justice Center Courts Building Improvements
Renovation
Post-Bid
$350,000 to $400,000 est. value
Galveston, TX 77551

Restroom Project on the City Square
Results
Lexington, TX

ADA Interior Improvements
Renovation
Results
$8,682,000 est. value
Corpus Christi, TX

Courthouse Restoration and Rehabilitation Project
Renovation
Construction
Baird, TX 79504

City Hall First Floor Improvements
Renovation - 5,100 SF
Construction
$1,300,000 est. value
Temple, TX 76501

Court Remodel, Annex 1st Floor
Renovation, Alteration
Pending Verification
$1,345,950 est. value
Killeen, TX

Relocate Public Safety Facility - Police/Fire/Court
Renovation
Pending Verification
$4,500,000 est. value
Port Arthur, TX

City Hall Renovations
Renovation
Conception
$36,100,000 est. value
Richardson, TX

Last Updated 12/13/2022 03:08 PM
Project Title

Orchestra Shell Fabrication and Installation at Texas Hall

Physical Address View project details and contacts
City, State (County) Arlington, TX 76010   (Tarrant County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

** As of December 13, 2022, no bid received for this project. No definite date for the rebid.** Furnish all labor, materials, tools, and equipment to fabricate and install Orchestra Shell at Texas Hall. Please submit all questions to the contact person (Section 1.6), in writing, by close of business on Friday, November 11, 2022

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents