Similar Projects
WPCP Pond 2-3 Gate Replacement
Renovation, Infrastructure
Bidding
$300,000 est. value
Fort Wayne, IN

Steel Pipe
Infrastructure
Bidding
Fort Wayne, IN

2021 Helen P. Brown Natatorium Bulkhead Replacement
Post-Bid
Fort Wayne, IN 46806

Ladig No. 2 Drain Reconstruction
Infrastructure
Post-Bid
Fort Wayne, IN

Small Structure Pipe Lining
Results
IN

Shank Tile Drain
Results
IN

Pierson Drain No - 2 Branch No- 2 at Nevada Avenue
Infrastructure
Bidding
$300,000 est. value
Fort Wayne, IN 46805

Quantity Purchase Award (QPA) Agreement for High Density Polyethylene and Profile Wall PVC Pipe Liner
Term Contract
Post-Bid

Franke Park Drainage Improvements
Results
Fort Wayne, IN 46808

Aluminum Box Culverts
Term Contract
Post-Bid
Fort Wayne, IN

HDPE Pressure Utility Piping
Results
Fort Wayne, IN

Various Types of Corrugated Metal and Plastic Pipe for the Year 2022
Term Contract
Post-Bid
IN

Oaks Tile Repair
Infrastructure
Results
Fort Wayne, IN

Corporate Hangar 2016 Drainage Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

Prairie Meadows Tile Repair
Infrastructure
Results
Fort Wayne, IN

Last Updated 04/19/2022 05:06 AM
Project Title

St. Marys River Streambank Restoration Phase II

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46805   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall provide for a complete installation, and shall be carried out in a timely manner according to the Contract Documents. Project consists of the restoration and stabilization of two sections of streambank on the St. Marys River in downtown Fort Wayne and the enhancement of an existing canoe launch. The first site begins slightly downstream of the Old Fort pedestrian overlook and continues downstream to the Phase I restoration work. The second site begins at the downstream end of the Phase I restoration work and continues to just upstream of the Old Fort’s canoe launch.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents