Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2021 Washroom and Life Safety Work
Renovation
Bidding
Palatine, IL 60067

AERO Therapeutic Center Bid Release 02
Renovation
Bidding
Burbank, IL 60459

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Orozco School Environmental Abatement
Renovation
Results
Chicago, IL 60608

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Phase-5-Group-7-STR
Renovation
Bidding
Chicago, IL

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Disaster Recovery Services
Results

2022 Kitchen and Wash Room Renovation and Life Safety Work
Renovation
Bidding
Palatine, IL 60067

Maine South High School
Post-Bid
Park Ridge, IL

Last Updated 11/11/2021 07:27 AM
Project Title

CPS Phase-5-Group-6-Structural Repairs

Physical Address View project details and contacts
City, State (County) Chicago, IL 60617   (Cook County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2022-46491-STR: Bowen HS – 2710 E 89th St 2022-22291-STR: Bradwell ES – 7736 S Burnham Ave 2022-22361-STR: Brownell ES – 6741 S Michigan Ave 2022-22411-STR: Burke ES – 5356 S King Dr 2022-22621-STR: Carver ES – 901 E 133rd Pl 2022-53011-STR: CVCA HS – 2100 E 87th St 2022-23561-STR: Harte ES – 1556 E 56th St 2022-24301-STR: Madison ES – 7433 S Dorchester Ave 2022-24841-STR: Park Manor ES – 7037 S Rhodes Ave 2022-31181-STR: Parker ES – 6800 S Stewart Ave 2022-25121-STR: Revere ES – 1010 E 72nd St. Ave 2022-25591-STR: Taylor ES – 9912 S Avenue H Ave 2022-24441-STR: Till ES – 6543 S Champlain Ave

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents