Similar Projects
New Vehicle Storage Facility
New Construction
Conception
NY

14 Commerce Street Transit Center - Facility Rehabilitation - Design and Construction - Dutchess County
Renovation
Conception
$5,535,000 CJ est. value
Poughkeepsie, NY 12603

QueensWay Park Rail Corridor Conversion
Infrastructure
Design
$120,000,000 CJ est. value
New York, NY 11693

New Bus Terminal - City of New York
New Construction, Infrastructure - 2,000,000 SF
Design
$3,500,000,000 CJ est. value
New York, NY 10018

Bathroom Renovations at Mitchel Field
Renovation
Bidding
$100,000 CJ est. value
Garden City, NY 11530

Vehicle Exhaust Hose Reel Project at Mitchel Field
Renovation
Bidding
$100,000 CJ est. value
Garden City, NY 11530

Town of Delaware - Highway Garage
New Construction - 10,000 SF
Post-Bid
Hortonville, NY

RFQ D/B - Grand Central Subway Station Mezzanine Finishes, Escalator Replacement
Renovation
Post-Bid
$100,000,000 CJ est. value
New York, NY 10007

Transportation Center Renovations
Renovation
Results
$700,000 est. value
Elmira, NY 14901

BC- Transportation Facility Improvements
Renovation
Results
$706,000 to $1,287,000 est. value
Vestal, NY 13850

Adirondack Scenic Railroad Maintenance and Repair Facility
New Construction, Renovation
Construction
Utica, NY 13501

Mahopac Central School District - Reconstruction - Mahopac High School, Mahopac Middle School, Mahopac Falls School, Bus Garage, and New Pump House
Renovation
Construction
$200,000 to $5,250,000 est. value
Mahopac, NY 10541

RFP Design - Architectural and Engineering Design Services for the Penn Station Reconstruction Project
Renovation
Pending Verification
$100,000,000 CJ est. value
New York, NY 10007

Connect Long Island - Nicolls Road BRT Corridor
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Centereach, NY 11720

Thruway Authority Design-Build Project
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Albany, NY 12207

Last Updated 01/14/2023 01:01 PM
Project Title

RFP Design - Metro - Division Street Linear Transit Hub

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14204   (Erie County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Niagara Frontier Transportation Authority (NFTA) owner and operator of the NFTA-Metro, invites interested Consultants to submit a technical proposal that have the requisite, demonstrable competence and experience in architectural and engineering services for the design, construction monitoring, and design support services during construction for the planned transit hub entitled "Metro - Division Street Linear Transit Hub". Qualified firms both singly or in teams must have the requisite, demonstrated competence and experience in and a thorough knowledge of the required architectural and engineering services required for the Project. Qualified firms must demonstrate service competency expertise in concept development, planning, project design, agency coordination, procurement, construction administration, and commissioning. The project work requires full architectural and engineering services including civil site plan development, soils/foundation engineering, utility design and coordination (power, storm sewer, communications, internet), architectural design (structure design, graphics and renderings / Models / Photography), structural design, and electrical (power distribution, communications including video surveillance). The project shall create a transit plaza and hub along the north side of North Division Street in Downtown Buffalo, between Ellicott Street and Washington Street. This block currently services five bus routes at three bus stops, with more than 850 riders, on average, boarding per day (2021). The hub shall include an iconic canopy structure that encompasses the three bus stops and provide a comfortable environment through varying levels of shelter, amenities, lighting, and considerations for safety while being sensitive and supportive of the surrounding area and community. The established DBE goal is 17%. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents