Similar Projects
Windham Middle School SRRF Exterior ADA Access Upgrade
Post-Bid
Windham, ME 04062

Highland Beach Sidewalk Project
Infrastructure
Post-Bid
Bridgton, ME 04009

Route 35 Sidewalk Improvements
Results
Windham, ME 04062

Portland Bayside Trail Improvements
Results
Less than $310,000 est. value
Portland, ME

Marginal Way Improvements
Results
Less than $1,000,000 est. value
Portland, ME

Cedar Street Parking Facility
Results
Brunswick, ME 04011

Peaks Island Parking Lot Improvements
Results
Less than $145,000 est. value
Portland, ME

Shaker Road Sidewalk and Drainage Improvements Project
Results
Gray, ME 04039

Upper Main Street Parking Lot
Results
Bridgton, ME

Windham Middle School SRRF Interior ADA Improvements
Results
Windham, ME 04062

2021 Concrete Sidewalk Rehabilitation Project
Results
Portland, ME

2021 Portland Transportation Center Neighborhood Byway
Infrastructure
Results
$367,000 est. value
Portland, ME

Bayside Paving and Sidewalk Improvement Project
Infrastructure
Results
$590,000 est. value
Portland, ME

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Bridge Replacements and Multiuse Path
New Construction, Infrastructure
Results
$22,871,000 est. value
ME

Last Updated 12/17/2021 09:07 AM
Project Title

Westbrook Street Shared Use Path – Phase II

Physical Address View project details and contacts
City, State (County) South Portland, ME 04106   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: Construction of a bituminous shared use path including an elevated sidewalk with retaining wall, associated curbing, paving, and drainage work for the installation, modification, alteration and adjustments of catch basin and drain manhole structures. Additional work includes, but is not limited to, earthwork, pavement marking removal and installation, pedestrian signal upgrades, pedestrian and vehicular traffic control and all associated work as shown on contract drawings and documents.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents