Similar Projects
Everglades National Park Project NP SER PMS FY22(1)
Infrastructure
Design
$5,000,000 est. value
Homestead, FL 33030

Biscayne House
New Construction, Infrastructure - 88,103 SF
Design
$24,000,000 est. value
Miami, FL 33137

Citywide Sidewalk Improvements Phase II
Infrastructure
Bidding
$300,000 est. value
Doral, FL

Improvements to South West 87 Avenue Bridge Over Canal C-100
New Construction, Infrastructure
Bidding
$3,076,803 est. value
Miami, FL 33156

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

Safe Route to Schools Locations Phase 22 FM 439895-1
Post-Bid
Less than $171,530 est. value
Hialeah, Miami Gardens, Opa-locka, FL 33014

VCA/ADA Accessibility Improvements to Common Areas and Parking Spaces - 30 West 33rd / 35 West 32nd Street
Results
Hialeah, FL 33010

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Marco Canal Culvert Headwall and Embankment Improvement Project
Infrastructure
Bidding
Miami Gardens, FL

Safe Route to Schools Locations Phase 21 FM 439894-1
Post-Bid
Less than $382,771 est. value
Miami, FL 33144

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Maintenance and Repair Work for City Roads, Streets and Facilities
Infrastructure
Bidding
$220,000 est. value
Aventura, FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Construction of New Pedestrian Pathway at Fuchs Park
Results
Miami, FL 33143

Roadway Resurfacing - Multiple Sites
Infrastructure
Bidding
$4,234,195 est. value
Miami Springs, FL

Last Updated 06/27/2022 07:19 AM
Project Title

Intersection Improvements to Old Cutler Road at SW 152 Street and SW 184 Street

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,821,777
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to the following: The construction of new roundabouts with sidewalks, curb and gutters, a storm drainage system, irrigation, pavement markings and signage, and roadway lighting along Old Cutler Road at the intersection with SW 152 Street and with SW 184 Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Exterior Lighting, Roadway Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents