Project Title | AS/SVE Remediation System Installation |
Physical Address | View project details and contacts |
City, State (County) | Saint Stephen, MN 56375 (Stearns County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $483,486 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: 309 County Road 2 South, St. Stephen, MN 56375 Est. Completion Date: May 1, 2024 A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Project administration, mobilization and demobilization, including utility locates and all temporary facilities and controls 2. Pre- and post-construction topographic surveys 3. Asphalt & concrete demolition and disposal 4. Trenching, backfilling and compacting, including clean soil importing (if needed) 5. Underground pipe installation 6. AS/SVE Concrete pad construction, Bituminous concrete pavement replacement, and AS, SVE and monitoring well head completions 7. Construct turnkey, enclosed AS/SVE System and ship and unload at Site 8. Power Service Drop and Electrical Work 9. Internet connection 10. Final Site Assembly 11. Site Restoration UMMARY OF WORK (SEE SECTION 01 10 00 FOR FULL SCOPE OF WORK) A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Project administration, mobilization and demobilization, including utility locates and all temporary facilities and controls 2. Pre- and post-construction topographic surveys 3. Asphalt & concrete demolition and disposal 4. Trenching, backfilling and compacting, including clean soil importing (if needed) 5. Underground pipe installation 6. AS/SVE Concrete pad construction; bituminous concrete pavement replacement; and AS, SVE and monitoring well head completions 7. Construct turnkey, enclosed AS/SVE System and ship and unload at Site 8. Power service drop and electrical work 9. Internet connection 10. Final site assembly 11. Site restoration C. DESCRIPTION OF ALTERNATES Alternative 1: Please provide an alternative AS/SVE System Enclosure lump sum cost (Line Item 12 below) with a Busch MINK MM 1102 BP (A) air sparge compressor and an appropriately sized American Industrial ACA heat exchanger instead of the air sparge compressor and heat exchanger specified in the Contract Drawings and Section 02 50 01b Question Deadline 06/29/2023 at 2:00 PM CT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |