Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Live Oak Drainage Wells Phase 1
Bidding
Less than $400,000 est. value
Live Oak, FL

LMI Milton Roy Metering Pump
Post-Bid
Tampa, FL 33602

Jet Water Pump Replacement
Post-Bid
Orlando, FL 32826

Rental, Pump Equipment
Term Contract
Results
$1,250,000 est. value
FL

Regional Facility Site Pump Station Expansion Project
Results
$2,168,480 est. value
Clearwater, FL 33763

Cleaning of Well at Highland Village
Post-Bid
North Miami Beach, FL 33162

South Hillsborough Aquifer Recharge Expansion
Results
$1,643,200 est. value
Tampa, FL 33600

Atlantic/Brentwood Deep Injection Well, IW-1 Acidization and Rehabilitation
Post-Bid
Less than $250,000 est. value
Sarasota, FL 34230

N--Services: Replace Chilled Water Pumps (Service Only - Pumps/Motors Supplied)
Results
Miami, FL 33125

SDWWTP Plug and Abandon FA Monitoring Wells and Install / Replacement of FA Wells
Post-Bid
Less than $3,810,945 est. value
Cutler Bay, FL 33190

Public Water Supply Well Construction
Results
Live Oak, FL 32064

Pump
Post-Bid
Lakeland, FL 33801

West Water Treatment Plant High Service Pumps MCC Replacement
Results
Less than $320,000 est. value
Deerfield Beach, FL 33441

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Last Updated 10/21/2020 03:40 PM
Project Title

Replace Chiller and Pumps at USCG Sector Key West, Florida

Physical Address View project details and contacts
City, State (County) Big Coppitt Key, FL 33040   (Monroe County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, supervision, equipment, materials, and tools to perform tasks, but not limited to the following: provide temporary 50-ton chiller and pump during duration of demolition and construction; connect to existing chilled water electrical, and utility systems; provide temporary cooling to include all maintenance, transportation, pipes, electrical cable, and connections for a fully functional replacement chiller; temporary chiller shall be removed from USCG property after installation of new chiller; demolish existing 50-ton water-cooled chiller, chilled water pump, and accessories, without interfering with the "STANDBY" (temporary) chiller system operations; provide two new 30-ton nominal capacity water-cooled chillers with valves and accessories; provide two new vertical inline pumps with valves and the accessories; provide new electrical components to support modifications to existing systems; provide new air separator, expansion tank, backflow prevent for makeup water and accessories; backflow preventer shall be replaced same day as demolished backflow preventer; provide water treatment for existing chilled water system; treatment shall include initial survey; provide factory start up and integrate new chiller with new pumps; and remediate LBP (lead based paint) and asbestos impacted by demolition & installation in accordance with survey provided (pending survey).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents