Similar Projects
3356 Peachtree Road Buckhead Residential Tower
New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Atlanta, GA 30326

Old Riverside Park Construction - City of Sandy Springs
New Construction
Conception
$5,000,000 est. value
Sandy Springs, GA 30328

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Fire Station 5 Construction
New Construction, Infrastructure - 10,912 SF
Design
$3,000,000 CJ est. value
Sandy Springs, GA 30328

RFQ Contractor-Arts and Humanities Building Roof Replacement
Renovation - 26,000 SF
Bidding
$1,400,000 CJ est. value
Atlanta, GA 30303

Riverside Drive Stormwater Mitigation Project
Infrastructure
Bidding
$400,000 CJ est. value
Sandy Springs, GA 30328

Physical Activities Center Expansion Services
Addition, Demolition, Renovation, Infrastructure - 4,500 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Addition, Demolition, Infrastructure
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30334

FY 21 MRRF ADA Projects
Renovation
Results
$540,000 est. value
Atlanta, GA 30302

CDBG Utility Building And Site Improvements
New Construction
Results
College Park, GA 30337

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Overtime Elite
New Construction - 103,000 SF
Construction
$12,000,000 est. value
Atlanta, GA 30363

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Grove Park Microsoft Offices
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Atlanta, GA 30318

Veterans Park - City of Sandy Springs
Infrastructure
Conception
$4,950,000 CJ est. value
Sandy Springs, GA 30350

Last Updated 10/19/2022 06:01 PM
Project Title

Student Athlete Performance Center / Edge Rice New Construction

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30313   (Fulton County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, College/University, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $55,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 19, 2022, an architect has been awarded. *The previous solicitation is listed below for reference. The Board of Regents of the University System of Georgia ("BOR") as ("Owner"), on behalf of Georgia Institute of Technology ("Georgia Tech"), ("User") is soliciting statements of qualifications from firms interested in providing professional design services for the construction of a project known as Project No. 0331-2020 "Student Athlete Performance Center/Edge Rice New Construction" at Georgia Institute of Technology, Atlanta, Georgia. This Request for Qualifications (RFQ) seeks to identify potential providers of the above-mentioned services. Some firms that respond to this RFQ, who are determined by the Owner to be especially qualified, may be deemed eligible and may be invited to interview and offer proposals for these services. All respondents to this RFQ are subject to instructions communicated in this document, and are cautioned to completely review the entire RFQ and follow instructions carefully. Georgia Tech reserves the right to reject any or all statements of qualifications or proposals, and to waive technicalities and informalities at their discretion. The new facility is estimated to be approximately 115,000 GSF. The departmental square footage breakdown is roughly: 23,000 sf Sports Medicine; 3,200 sf Total Person/Nutrition; 600 sf Ticket Sales; 9,000 sf Academic Success; 7,500 sf Dining Hall, Misc. 7,200 sf; Olympic Strength and Conditioning 10,000 sf; Football Strength and Conditioning 13,600 sf; Football Offices and Meeting Rooms 12,200 sf; Loading/Equipment 4,200 sf; Building Support 11,800 sf. Additional space may be added to the program as budget allows. The preliminary Stated Cost Limitation (SCL) or construction cost is estimated at $55.3. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. STEP I (RFQ) Estimated Time Line Deadline for written questions/requests for clarification (see section 6). 05/18/2022 Noon c. Owner issues responses to questions received by deadline No Later Than 05/25/2022 It is the responsibility of each respondent to examine the entire RFQ, seek clarification in writing, and review its submittal for accuracy before submitting the document. Once the submittal deadline has passed, all submissions will be final. The Owner will not request clarification from individual proposer regarding their submission, but reserves the right to ask for additional information from all parties who have submitted qualifications. Questions about any aspect of the RFQ, or the project, shall be submitted in writing (email is preferable) to: Lindsey Cottingham Senior Project Manager Georgia Institute of Technology 151 6th Street NW Atlanta, Georgia 30332-0351 Email: Lindsey.Cottingham@facilities.gatech.edu STEP II (RFP) Estimated Time Line Deadline for finalist submission of written questions and requests for clarification 07/01/2022 Noon Owner releases responses to questions received No Later Than 07/08/2022 The method of contractor selection has not been determined at this time.

Details

115,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents