Scooters Coffee / Galesburg
New Construction, Infrastructure - 668 SF
Design
$200,000 CJ est. value
Galesburg, IL 61401

Greenhouse and Lab Space
New Construction, Infrastructure
Design
$147,000 CJ est. value
Knoxville, IL 61448

2023 Modifications to Leachate Collection System Landfill #3
Renovation
Bidding
$1,400,000 CJ est. value
Oneida, IL 61467

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Generator at the Water Plant
Renovation
Post-Bid
$216,000 CJ est. value
Victoria, IL 61485

2022 Wastewater Treatment Plant Improvements
New Construction, Infrastructure
Results
$21,255,000 CJ est. value
Galesburg, IL 61401

2022 Wastewater Treatment Plant Improvements
New Construction, Infrastructure
Results
$21,255,000 CJ est. value
Galesburg, IL 61401

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

2022 Miscellaneous Sidewalk Replacement
Infrastructure
Construction
$290,749 CJ est. value
Galesburg, IL 61401

New Science and Technology Center - Carl Sandburg College
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Galesburg, IL 61401

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Knoxville, IL 61448

Fire Station Storm Sewer Project
Infrastructure
Results
$141,881 CJ est. value
Oneida, IL 61467

Science and Technology Bid Package 01 - Demolition and Utility Work Project
Demolition, Renovation, Infrastructure
Construction
$900,000 CJ est. value
Galesburg, IL 61401

Parking Lot Resurfacing
Infrastructure
Post-Bid
$200,000 CJ est. value
Knoxville, IL 61448

Science and Technology Center BP2 - Site Demolition and New Construction
Demolition, New Construction, Infrastructure
Construction
$30,000,000 CJ est. value
Galesburg, IL 61401

Last Updated 05/04/2023 06:02 PM
Project Title

Replacement of Aerator on Ground Tank

Physical Address View project details and contacts
City, State (County) Oneida, IL 61467   (Knox County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $222,640 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing of all labor, materials and equipment for the replacement of existing forced draft aerator on top of ground storage tank, and miscellaneous improvements at the water treatment plant. There will be no prebid conference for this project. Engineer will transmit to all prospective Bidders such Addenda as Engineer considers necessary in response to questions arising prior to 48 hours before the opening of Bids. All questions concerning the Bidding Documents should be emailed to Mr. Kevan Cooper of Bruner, Cooper and Zuck, Inc. at all@bczengineering.com. Each Bid shall be accompanied by a certified or cashier's check payable to the order of the Owner, or a satisfactory bid bond executed by the Bidder and a surety company, in an amount not less than five percent of Bidder's maximum Bid price as a guarantee that the Bidder will within fifteen (15) days after the date of the award of a contract execute an Agreement and file bonds and insurance as required by the Bidding Documents if his Bid is accepted. If the Successful Bidder fails to execute and file an Agreement, bonds and insurance as required by the Bidding Documents, the amount of the security submitted with his Bid shall be forfeited. A payment and performance bond are required in connection with this project. The payment bond shall specifically provide that the Principal must pay all sums of money due or to become due for any labor in accordance with the Illinois Prevailing Wage Act, (IL Rev. Stat. Ch. 48, Sec. 39(s)- 1-12). The Owner reserves the right to reject any Bid for failure to comply with all requirements of this notice or any of the Bidding Documents; however, it may waive any minor defects or informalities at its discretion. The Owner further reserves the right to reject any and all Bids or to award a contract which in its judgment is in the best interest of the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents