Similar Projects
WWTP (Wastewater Treatment Plant) Expansion - City of Clinton
Addition, Infrastructure
Design
$5,000,000 CJ est. value
Clinton, MS 39056

2021 CDBG Wastewater Improvements
Renovation
Design
$6,000,000 CJ est. value
Morton, MS 39117

Wastewater Facility Improvement Project - Phase 3
Renovation
Bidding
$2,000,000 CJ est. value
Biloxi, MS 39530

2023 Wastewater Improvements Project
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Morton, MS 39117

Utility Extension & Treatment Plant Expansion - HLRA - 11
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Moselle, MS

Wastewater Treatment Improvements
Renovation
Post-Bid
$200,000 CJ est. value
Tutwiler, MS 38963

Wastewater Treatment Facilities and Collection System Improvements
Renovation
Results
Marietta, MS

Wastewater Facilities Improvements
Renovation
Results
Marks, MS

Supply And Install Backflush Units for Water Treatment System
Renovation
Design
$250,000 CJ est. value
Vicksburg, MS 39183

Piney Woods Infrastructure DRA Improvements - Wastewater
Infrastructure
Bidding
$1,387,331 CJ est. value
Braxton, MS 39044

CDBG 2021, Wastewater System Improvements
Renovation
Post-Bid
$3,000,000 CJ est. value
Durant, MS 39063

Wastewater Treatment Improvements
New Construction
Results
French Camp, MS

Plum Point Community Water Treatment Plant Improvement and Water Well Replacement Project
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Pope, MS 38658

2020 CDBG - Sewage Treatment Plant Improvements
Renovation, Infrastructure
Results
$285,000 CJ est. value
Crowder, MS 38646

Harrison County Utility Authority
Term Contract
Post-Bid
Gulfport, MS 39501

Last Updated 07/18/2023 10:06 AM
Project Title

Facility Improvements Contract B - Additional Treatment Units

Physical Address View project details and contacts
City, State (County) Fulton, MS 38843   (Itawamba County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $336,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Upon receipt of written notice of the acceptance of this Bid, Bidder will execute the formal contract attached within 15 calendar days and deliver a Surety Bond or Bonds as required by Article 5 of the General Conditions. The Bid Bond attached in the sum of 5%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents