Similar Projects
Wabash Avenue Resurface - City of Effingham
Infrastructure
Conception
$350,664 CJ est. value
Effingham, IL 62401

Meijer - Oak Point Centre / Effingham
New Construction, Infrastructure - 150,000 SF
Design
$20,000,000 CJ est. value
Effingham, IL 62401

Extend Runway 11-29 at Effingham County Memorial Airport - Effingham County
Infrastructure
Design
$3,500,000 CJ est. value
Effingham, IL 62401

Pump Station Installation Interconnect to Ej Water Cooperative, Inc
Infrastructure
Bidding
$520,000 CJ est. value
Montrose, IL 62445

Replace Single Span Ppc Deck Beam Bridge
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Mason, IL 62443

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RFQ - Phase I/II Engineering Services for Reconstruction of Structure carrying IL 32/33 over I-57/70
Infrastructure
Post-Bid
$12,730,000 CJ est. value
Effingham, IL 62401

Bridge Joint Repairs, Bridge Deck Patching, Slope Wall Replacement and Bridge Deck Scarification and Overlay at the I-57 / I-70
Infrastructure
Results
$2,467,116 CJ est. value
Effingham, IL 62401

Patching, resurfacing and aggregate shoulders on IL 33
Infrastructure
Results
$2,949,123 CJ est. value
Effingham, IL 62401

O'Reilly Auto Parts (EFF) #1400 / Effingham
New Construction, Infrastructure - 8,084 SF
Construction
$2,200,000 CJ est. value
Effingham, IL 62401

WestDale Project
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Effingham, IL 62401

Consists of Removing the Existing Structure and Constructing of a New Single Span Ppc Deck Beam Bridge,
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Mason, IL 62443

Construct Concrete Courtyard and Rainwater Drainage
Infrastructure
Post-Bid
$550,000 CJ est. value
Effingham, IL 62401

Hma Resurfacing With Aggregate Shoulders, and Guardrail Replacement on East 1600th Avenue
Infrastructure
Results
$1,759,700 CJ est. value
Effingham, IL 62401

Demolish and Remove Old Gazebo and Construct New Gazebo for Effingham County
Infrastructure
Post-Bid
$290,000 CJ est. value
Effingham, IL 62401

Last Updated 08/24/2023 02:08 PM
Project Title

Thies Avenue Extension/Airport Road Improvements

Physical Address View project details and contacts
City, State (County) Effingham, IL 62401   (Effingham County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,612,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Includes the Following Work: Construction of Approximately 4,900 Lf of Concrete Curb and Gutter, Street, Sanitary Sewer, and Watermain. City of Bids Are Requested for the Following Contract: Road Effingham Thies Avenue Extension/airport Improvements. Instructions to Bidders: for All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. Some of the Project Funding Would Be From the Community Development Block Grant (Cdbg) Program. Attention is Called to the Fact That the Firm Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Color, Religion, Sex, or National Origin and That Federal Section 3 and All Other Federal, State and Local Provisions Shall Apply. The City of Effingham Reserves the Right to Reject Any or All Proposals or to Waive Any Informalities in the Procurement Process. The Prime/general Contractor and Subcontractors Must Not Be Excluded From Participating in Any Federal Assistance Program [24 Cfr 85, Subpart C 85.35] Prior to Award. Bidder Must Comply With the Following: Business Enterprise Program Act for Minorities, Females, and Persons With Disabilities (Bep) (30 Ilcs 575/0.01 Et Seq.) Requirements Outlined in the Bid Form. If These Requirements Cannot Be Met the Contractor Must Document Good Faiths Efforts. The Bidder is Required to Fill Out the Utilization Plan as a Part of the Bid Packet. The Bidder is Required to Advertise for a Minimum of 14 Days in a Local Newspaper of General Circulation for Bep Good Faith Efforts. The Contractor Shall Include With Their Bid a Copy of the Certificate of Publication Showing the Notice Ran in the Newspaper. Illinois Prevailing Wage Act (820 Ilcs 130/) Employment of Inois Workers on Public Works Act Preference Act (30 Ilcs 570/0.01 Et Seq.) Illinois Works Job Program Act (30 Ilcs 559/20)

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents