Similar Projects
Marina - Phase II - James City County
Infrastructure
Conception
$7,026,600 est. value
Williamsburg, VA 23185

Jamestown Beach - James City County
New Construction, Alteration
Conception
$1,465,000 est. value
Williamsburg, VA 23185

Virginia Greens Retirement Community
New Construction, Infrastructure - 176,495 SF
Design
$30,000,000 CJ est. value
Williamsburg, VA 23185

WAWA W50 / Williamsburg
New Construction, Infrastructure - 6,049 SF
Design
$1,800,000 CJ est. value
Williamsburg, VA 23188

James City Service Authority (JCSA) Central System Water Treatment Improvements
Renovation
Bidding
$2,000,000 CJ est. value
Williamsburg, VA 23188

Siege Lane Retention Basin
Infrastructure
Bidding
$2,000,000 CJ est. value
Yorktown, VA 23692

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

PNC Bank - Sitework
New Construction
Construction
Williamsburg, VA 23185

Colin G. & Nancy N. Campbell Archaeology Center
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Williamsburg, VA 23185

New Elementary School - Williamsburg/James City County Public Schools
New Construction, Infrastructure
Pending Verification
$52,200,000 CJ est. value
Williamsburg, VA 23185

Waller Mill Park Improvements - City of Williamsburg
New Construction, Infrastructure
Conception
$500,000 est. value
Williamsburg, VA 23188

Tidal Wave Auto Spa
New Construction, Infrastructure
Design
$900,000 CJ est. value
Yorktown, VA 23692

Last Updated 11/03/2022 09:13 AM
Project Title

James City Service Authority LS 4-2 & LS 4-8 Wet Well Replacements, LS 2-4 Bar Screen Vault Installation

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23188   (James City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,106,310 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project generally consists of the demolition of existing 4-2 and 4-8 wet well and pump station fencing and installation of a new wet well and relocation of existing 25 HP suction lift pump system. The existing suction lift pump system has a maximum with of 2,600 lbs. The pump station shall connect to the existing influent manhole with new 8 gravity line. The pump station shall also connect to the existing force main with a 10 force main line. All existing electrical and control wiring and conduits shall be extended from the existing pump station building to the new wet well location. PVC coated rigid metal conduit and flexible PE conduit shall be minimum 3/4 . Lift Station 2-4 entails installing at 72 Diameter staddle manhole structure on top of an existing 20-inch ductile iron pipe. The structure bench is to be built according to plan, along with the bar screen structure.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents