Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value

SR 17 ET AL, NCR Seal 2022
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Parking Lot Preservation Phase Two
Alteration
Post-Bid
$846,000 to $951,000 est. value
Tumwater, WA 98501

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Spokane Valley, WA 99206

SR 18, SR 99, SR 516, Jenkins Ck Vic and Tukwila Vic and SR 181 Vic Paving and Deck Rehab and ADA
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value
WA

Logging Road Resurfacing
Infrastructure
Post-Bid
Montesano, WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

SR 142, Lyle to Little Klickitat River BR Chip Seal
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
WA

Pedestrian and Bicycle Master Plan Update
Alteration
Post-Bid
Bellingham, WA

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Last Updated 03/21/2022 05:20 PM
Project Title

City Safety Improvements

Physical Address View project details and contacts
City, State (County) Cle Elum, WA   (Kittitas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $115,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new sidewalks and replacement of guardrail at culvert west of West First Street and Stafford Avenue intersection. Installation of new streetlight and solar-powered flashing stop signs at Second Street and Floral Avenue intersection.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents