Similar Projects
UPS Distribution Hub
New Construction - 39,640 SF
Conception
$11,000,000 est. value
North Myrtle Beach, SC

Blaine Thompson Office/Warehouse
New Construction
Conception
Charleston, SC 29492

CubeSmart
New Construction - 10,000 SF
Design
$800,000 est. value
Daniel Island, SC 29492

Johns Island Commerce & Medical Park - Phase 2 & 4
New Construction - 75,000 SF
Design
Johns Island, SC

Public Storage
New Construction
Bidding by Invitation
Charleston, SC 29414

Pre-Engineered Metal Builldings for BCSD Facilities Division
Post-Bid
Moncks Corner, SC 29461

Rivers Bridge Fire Sub-Station
Post-Bid
Bamberg, SC 29003

Vehicle Storage Shed at Hilton Head Island Fire Rescue Headquarters
Results
Hilton Head Island, SC 29926

Design and Construction of Maintenance Shed
New Construction
Results
Less than $548,553 est. value
Mount Pleasant, SC 29464

AME Shell
New Construction - 275,000 SF
Construction
$11,465,755 est. value
Rock Hill, SC 29730

U-Haul Self Storage and Truck Rental Facility
New Construction - 131,650 SF
Construction
Rock Hill, SC

Maxwood Furniture Warehouse
Renovation
Pending Verification
Marion, SC

Santa Cruz Nutritionals
New Construction - 120,000 SF
Pending Verification
$10,000,000 CJ est. value
Sumter, SC 29154

Surfside Park Self Storage Facility
New Construction - 96,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Surfside Beach, SC

Pawleys Island Golf Carts Maintenance & Storage
New Construction, Renovation - 18,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Pawley's Island, SC 29585

Reported 08/10/2020 11:50 AM
Project Title

Walmart Distribution Center

Physical Address View project details and contacts
City, State (County) Ridgeville, SC   (Dorchester County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Qualified Bidding.
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $220,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 2,900,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents