Similar Projects
Government Road Multi-Use Pathway
New Construction, Infrastructure - 1,630 SF
Bidding
$400,000 est. value
Mattawa, WA

8th Street and Selkirk Avenue Improvements
Infrastructure
Bidding
$370,000 est. value
Mattawa, WA 99349

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

U-SE Road Overlay
Infrastructure
Results
$1,903,263 est. value
Ephrata, WA

Miscellaneous COF Upgrades
Infrastructure
Results
$470,000 est. value
Moses Lake, WA

3-Northeast Phase 4, Reconstruction Project
Infrastructure
Bidding
$1,500,000 est. value
Ephrata, WA 98823

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

I-90, Dodson Road to Adams County Line- Paving
Infrastructure
Results
$7,500,000 to $10,000,000 est. value
WA

Construction of Mob Parking Expansion
Term Contract
Post-Bid
Moses Lake, WA 98837

SR 17 Grape DR Intersection Safety Improvement
Infrastructure
Results
WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 06/20/2022 05:30 AM
Project Title

I-90/SR 26, Interchange Ramps Paving

Physical Address View project details and contacts
City, State (County) Moses Lake, WA 54656   (Grant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement repair, fog seal, planing bituminous pavement, centerline rumble strip, recessed pavement marker, pavement markings, traffic control and other work. Involves 37 items and 19 working days. This Contract provides for the improvement of *** I-90, MP 137.67 to MP 138.56 and SR 26 MP 0.00 to MP 0.40, in Grant County, I-90/SR 26 Interchange Ramps- Paving, by Removal of Structures and Obstructions, Removing Miscellaneous Traffic Items, Pavement Repair Excavation Incl. Haul, Asphalt for Fog Seal, Planing Bituminous Pavement, HMAfor Pavement Repair Cl. 3/8 In. PG 64H-28, HMA Cl. 3/8 In. PG 64H-28, HMA Sawcut and Seal, ESC Lead, Erosion/Water Pollution Control, Transportable Attenuator, Repair Transportable Attenuator, Flexible Guide Post, Barrier Delineator, Paint Line, Plastic Traffic Arrow, Painted Drainage Marking, Painted Junction Box Marking, Centerline Rumble Strip, Recessed Pavement Marker, Temporary Pavement Marking- Short Duration, Portable Changeable Message Sign,Radar Speed Display Sign, Other Temporary Traffic Control, Other Traffic Control Labor, Traffic

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents