Similar Projects
Multimodal Improvements 2022/23 - City of Eureka
Infrastructure
Conception
$3,936,420 est. value
Eureka, CA

Mad River Pipeline Valve Replacement - City of Eureka
Alteration
Conception
$400,000 est. value
Eureka, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Red Mountain Road Rocking
Infrastructure
Bidding
$100,000 CJ est. value
Longvale, CA 95490

Red Mountain Road Rocking
Infrastructure
Bidding
$100,000 CJ est. value
Longvale, CA 95490

Replace Solar Panels at the North Operations Center, Redwood National Park
Renovation, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Crescent City, CA 95531

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

Trinidad Fire Station - Paving Services
Infrastructure
Post-Bid
Trinidad, CA 95570

Bald Hills Road Resurfacing Project
Infrastructure
Results
Hoopa, CA 95546

RHMA-G and HMA
Infrastructure
Results
$26,000,000 est. value
CA

Nordic Aquafarms / Samoa Peninsula
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Samoa, CA 95564

Bio Solids Dewatering - City of Eureka
Alteration
Conception
$1,542,000 est. value
Eureka, CA 95503

Carol & Vernon Lewis Home
Addition, Demolition, Renovation, Infrastructure
Design
$220,000 CJ est. value
Weitchpec, CA 95546

The Legacy Renovation
Addition, Demolition, Build-out, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Crescent City, CA 95531

Last Updated 08/16/2022 08:32 AM
Project Title

GAOA Rec Facilities Water Systems Upgrades, Six Rivers National Forest

Physical Address View project details and contacts
City, State (County) Eureka, CA 95501   (Humboldt County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

GAOA recreational facilities water systems upgrades, six rivers national Forest, Eureka, California The Magnitude of the project is between $500,000 and $1,000,000. Please note proposals are required for this RFP see sections l/M An email copy of the bid bond is acceptable if bids are in excess of $150,000 SCOPE OF CONTRACT Statement of Work This project will construct vertical groundwater wells at 5 locations on the Six Rivers National Forest in Northern California. Currently drinking water at these 5 locations is provided by springs and creeks far from the point of use or a well under the influence of surface water. The new groundwater wells will replace the springs, creeks, and inadequate well as the source of drinking water. The work will include locating the best sites for the new wells; construction of individual drilled water wells; completion of water analysis, well logs, and test pump reports; and connection to the existing system. The 5 locations requiring new groundwater wells are: 1. Mad River Compound Trinity County; Next door to the US Forest Service Mad River Ranger District Office at 741 CA-36, Mad River, CA 95526; 4028'03"N 12331'41"W 2. Zenia Guard Statio Trinity County; 100 FS Road 2508, Zenia, CA 95595; 4012'29"N 12327'35"W 3. Salyer Guard Station Trinity County; 224 CA-299, Salyer, CA 95563; 4053'18"N 12335'07"W 4. Ruth Guard Station Trinity County; 19500 Lower Mad River Road, Ruth, CA 95526; 4015' 00"N 12319'10"W 5. Panther Flat Campground Del Norte County; 11000 Highway US-199, Gasquet, CA 95543; 4150'34"N 12355'51"W Item definitions are as follows: Items 2, 9, 16, 23, and 30 Locate Well Site Includes all work associated with finding the best location to drill a new well. Considerations include favorable geologic conditions for groundwater; access via existing roads; located in previously disturbed areas that will not require excessive grading, brushing, or the removal of large trees; and proximity to existing water storage tanks and water mainlines. The new well will be located within the disturbed areas of the compound, guard stations, and campground on Forest Service property. The well will not be placed within 100 feet of an existing or abandoned toilet, septic tank, or leach lines, per USDA Forest Service and California state standards. The new well will not be placed within a grazing range allotment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents