Similar Projects
Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Wootton Park Pickleball Court Conversion
Infrastructure
Bidding
$500,000 CJ est. value
Beloit, WI 53511

STH 59 & High Street Utility Improvements
Infrastructure
Bidding
$800,000 CJ est. value
Milton, WI 53563

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Water Service Replacements
Infrastructure
Post-Bid
Milton, WI

Euclid Avenue Reconstruction; Phase 1 and 2
Infrastructure
Results
Beloit, WI 53511

2021 Water Service Replacements
Infrastructure
Results
$60,000 est. value
Milton, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Edgerton Apartments
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Edgerton, WI 53534

New Fire Station
New Construction, Infrastructure
Pending Verification
$4,400,000 CJ est. value
Milton, WI 53563

2023 Utility Infrastructure Improvements
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Milton, WI 53563

Blackhawk Technical College Public Safety Training Center Education Building - Bid Package 2: Re-Bid of Drywall and Landscaping Work Packages
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Janesville, WI 53546

Sherwood Drive Utility Extension
Infrastructure
Results
Beloit, WI

Encompass Health Rehabilitation Hospital of Janesville
New Construction, Infrastructure - 49,000 SF
Pending Verification
$28,000,000 CJ est. value
Janesville, WI 53546

Last Updated 12/09/2022 05:07 AM
Project Title

Utility Structure Rehabilitation and Replacement

Physical Address View project details and contacts
City, State (County) Janesville, WI 53545   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,033,337 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all the labor, materials, equipment, and doing all the work necessary for replacement and/or rehabilitation of sanitary, storm, and water structures. The work will include replacement of approximately of 1 sanitary structure, 13 storm structures, 56 storm inlets and 12 water structures and rehabilitation of approximately of 109 sanitary structures, 39 storm structures, 39 storm inlets and 21 water structures. Also included are 1 sanitary sewer main point repair, 1 sanitary sewer main abandonment, 4 storm sewer main repairs and 2 lead water service replacements. The work under this contract is associated with the City's 2023 Street Rehabilitation Contract. All structure replacement-rehabilitation must be completed in a timely manner in advance of the street rehabilitation. All bidders shall bid in accordance with contract document's Section 2 'Information to Bidders'. The above Public Work will be let to the lowest responsible bidder and must be performed in accordance with the plans, specifications, and contracts on file with the City Clerk. The determination of the lowest responsible and best bid will be decided by the City Engineer, subject to review by the City Council. The Council reserves the right to reject any and all bids. No bid will be considered unless accompanied by a certified check equal to 10 percent of the bid or a bid bond in equal amount, payable to the City as guaranty that if the bid is accepted, the bidder will execute and file the proper contract and performance bond within ten days from the date the lowest responsible bidder's bid is accepted. In case the bidder fails to execute such contract and performance bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. If applicable, Federal Davis Bacon wage rates are included in the Contract Documents, as well as on file in the City Clerk's Office. No bidder may withdraw their bid within 45 days after the actual date of the bid opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents