Last Updated 07/30/2021 10:26 AM
Project Title

Contract 1 - Water Tower Improvements

Physical Address View project details and contacts
City, State (County) McBain, MI   (Missaukee County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water Tower Improvements include the following: Install sloped concrete floor over the existing flat concrete floor with a coating at the sidewall/new floor junction Replace the existing aluminum roof with a glass-lined roof Replace all the bolts on the tank sidewall Install a drain at the bottom of the sidewall Extend the fill/draw pipe and install deflector bars Install a fall prevention device on the sidewall ladders Modify the overflow pipe discharge Adjust the exiting mixer so that is sits above the floor a specified height

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents