Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

RFQ - On-Call Civil Engineering, Environmental, and Right of Way Professional Services
Term Contract
Conception
Hayward, CA 94541

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Reconstruct Drainage
Infrastructure
Design
$4,164,000 est. value
Willits, CA 95490

R Line Upgrade Phase 2 - Salt Creek Project
Infrastructure
Bidding
$800,000 CJ est. value
Imperial, CA 92251

2022 HSIP Traffic Signal Modifications at Various Locations
Infrastructure
Bidding
$615,000 CJ est. value
Rancho Cucamonga, CA 91730

Street Striping and Pavement Marking Services
Infrastructure
Sub-Bidding
$300,000 CJ est. value
San Bernardino, CA 92401

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Stormwater Facilities Master Plan
Infrastructure
Post-Bid
Carson, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Excavate Roadway, Place Cl2-AB and HMA (Type A) to Construct Turnouts
Infrastructure
Results
$1,230,000 est. value

Cesar E. Chavez Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 3,163 SF
Pending Verification
$19,000,000 CJ est. value
Los Angeles, CA 90033

Melrose Avenue Mixed Use Development / Los Angeles
Demolition, New Construction, Infrastructure - 1,649 SF
Pending Verification
$12,000,000 CJ est. value
Los Angeles, CA 90029

Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Better Bikeways San Fernando (ATP) - City of San Jose
Infrastructure
Design
$8,158,000 est. value
San Jose, CA 95154

Last Updated 07/25/2022 01:03 PM
Project Title

West Sacramento Flood Control Improvements

Physical Address View project details and contacts
City, State (County) West Sacramento, CA 95691   (Yolo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $175,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The detailed scope of work has not been disclosed. As of July 25, 2022, this project is in the design phase. An engineer has been selected for the project. Bidding is estimated to take place in early 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents