Similar Projects
WWFT Storage Tank Cleaning and Painting Projects
Post-Bid
New Port Richey, FL 34652

Storage Tank Repairs at Southeast Booster Station
Post-Bid
Less than $500,000 est. value
Panama City, FL 32403

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Water Tank Replacement - Contract I
Results
Less than $500,000 est. value
Cottondale, FL 32431

Hyatt 1st Floor - 2 Small Storage Tanks and 3 Expansion Tanks Replacement
Post-Bid
Orlando, FL 32827

Tank Cleaning Services, Wastewater Treatment Plants, Term Contract
Term Contract
Results
West Palm Beach, FL 33437

Reclaimed Water Ground Storage Tank Cleaning and Inspection
Term Contract
Results
Less than $45,000 est. value
Naples, FL 34112

PEP Tank Replacement
Results
Ormond Beach, FL 32175

35,000 Gallon Elevated Storage Tank Rehabilitation
Results
Lake Como, FL 32157

Remote Storage Tank Improvements Interbay
Results
Less than $1,800,000 est. value
Tampa, FL 33602

Cleaning and Inspection of Potable Water Storage Tanks
Results
Jupiter, FL

Diving Inspection and Cleaning of Potable Water Storage Tanks
Results
Fort Lauderdale, FL 33309

Elevated Water Storage Tank Annual Inspection and Maintenance
Term Contract
Results
Freeport, FL 32439

Last Updated 05/05/2021 07:17 AM
Project Title

Topaz Neighborhood Drainage Improvement

Physical Address View project details and contacts
City, State (County) Brooksville, Spring Hill, FL 34601   (Hernando County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is depicted and described on the construction plans and specifications and consists in general of the construction of a stormwater drainage system consisting of culverts, ditch bottom inlets, a mitered end section, and the restoration of driveways impacted by construction. The Vendor/Contractor shall locate and protect all existing utilities from damage during the work. All work is to take place within the existing right of way and/or on County owned property. The scope of this project also includes mobilization and demobilization, clean up, offsite transporting, and proper disposal of construction waste and demolition debris, installation and maintenance of erosion and sediment controls, installing and providing maintenance of traffic during construction, dewatering activities, sodding and restoring the site, utility coordination, and repairing public and private property damaged during construction of the project. The project is located on Topaz Street between Pierpoint Ave. and Colchester Ave. in Spring Hill in western Hernando County, Florida.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses, Sodding.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents