Similar Projects
Oslo Levee Repair
Design
$25,000 to $10,000 est. value
Oslo, MN

Montevideo Stage 3B Flood Risk Management Construction
Bidding
$1,000,000 to $5,000,000 est. value
Montevideo, MN

CR 61 Box Culvert Installation
Bidding
MN

HDPE Pipe & Directional Boring
New Construction
Post-Bid
Minneapolis, MN 55401

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

2020 Northeast Drainage Area Improvements
Results
$1,500,000 est. value
Lino Lakes, MN 55104

2020 Pond Maintenance
Results
Golden Valley, MN 55427

Karth Lake Runoff Control
Bidding
$171,000 to $180,000 est. value
Arden Hills, MN

DNR1 Eckvoll WMA Culvert Installation
Post-Bid
Gatzke, MN 56724

2020 Pond Cleaning
Renovation
Results
$110,000 est. value
West Saint Paul, MN 55118

Faribault County Ditch No. 25A
Bidding
$125,000 est. value
MN

Butler Road - Culvert Replacement
Post-Bid
MN

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

TH 65 East Service Road
Bidding
$5,000,000 est. value
East Bethel, MN

Watonwan and Brown County Judicial Ditch No. 18 Improvements
Term Contract
Post-Bid
$4,000,000 est. value

Reported 11/07/2020 12:00 AM
Project Title

NLH Pond Kettle Repair

Physical Address View project details and contacts
City, State (County) New London, MN 56273   (Kandiyohi County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace damaged concrete in pond kettles at New London Hatchery. Primary project involves the removal and replacement of damaged walls, base pad and landing at the bottom of stairs in Ponds 10 and 11. Broom landing and base pads. Waterproof with Xypex or approved equivalent. Grade landing to form a slight slope towards the ponds to drain. Alternate 1: Pond 9 - Cut back on each side of upright section of kettle where slot is and rebuild 8 LF tall wall. Remove and replace the landing at the bottom of the stairs. Broom and grade landing so there is a slight slope towards pond to drain. Alternate 2: Pond 12 - Remove and replace landing at bottom of stairs. Broom and grade landing so there is a slight slope towards pond to drain. Alternate 3: Pond 6 - Remove and replace base bad and wall going back into each side where it slopes up. Broom base pad. Alternate 4: Pond 3 - Remove and replace wall going back into wall where it slopes up on each side. Alternate 5: Pond 2 - Remove and replace wall on two sides and patch bottoms on both sides of the outlet walls.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents