Last Updated 05/08/2020 02:47 PM
Project Title

Electrical Improvements to Lift Station E9

Physical Address View project details and contacts
City, State (County) Clermont, FL   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $59,123
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Successful contractor shall provide all labor, materials, equipment and tools necessary to perform electrical improvements to lift station E9. All respondents shall hold a valid electrical license, general license and any other contractor’s license, issued by the State of Florida, which may be required to complete the work. A copy of all licenses pertaining to this work must be submitted with the bid. Successful respondent shall have been in the commercial/industrial electrical business for a minimum of five (5) years and provide evidence of such with their bid. Respondents shall provide experienced technicians to perform all labor and provide all materials, tools, equipment, permits and licensing necessary to perform the work. Successful respondent is solely responsible for the safety of their employees and sub-contractors relative to the work, work procedures, material, equipment, transportation, signage and related activities and equipment. The scope of work may not reflect all work and material necessary to retrofit new installation to existing equipment. Successful respondent will be responsible for any changes, i.e. may need new wire from generator to transfer switch; may need to replace power distribution block in pump control panel, etc. SCOPE OF WORK - Replace non fuse disconnect with new 400 amp Stainless Steel non fuse disconnect. - Replace 400 amp meter base with new 400 amp meter base. - Replace 400 amp main breaker and enclosure with new 400 amp main breaker with Stainless Steel enclosure. - Replace 400 amp transfer switch and enclosure with new 400 amp transfer switch with Stainless Steel enclosure. - Replace existing J-box with new 18in. x 18in. x 8in. stainless steel hinged J-box with backplane. - Add new 24in. x 24in. x10 in. hinged stainless steel J-box with backplane and provide terminal blocks for motor leads. - Install three (3) 2in. PVC conduits from VFD’s to 24in. x 24in. x 10in. J-box. - Core drill three (3) holes in wet well and install three (3) 4in. PVC conduits with seal offs to 24in. x 24in. x 10in. J-box. - Replace terminal block in MDP. - Replace wire from J-box at transformer to non fuse disconnect. - Replace wire from generator to transfer switch. - Replace wire from transfer switch to MDP. - Pull new wire from VFD’s to 24in. x 24in. x 10in. J-box. - Install new Myers hub on all side penetrations on equipment. - Replace old uni-strut with new stainless steel uni-strut. Use all stainless steel hardware. - Replace old 4in. concrete posts with new 4in. aluminum posts (IMC Rigid). - Must provide backup 250KW generator while work is being performed. - Must coordinate with electric energy company before work is performed. - Pull all necessary permits and arrange for inspections as required. - Include signed sealed drawings if needed for the permitting process. - Post all applicable permits at job site. - Restore gravel to existing condition. - Provide testing and training to city employees. - Warranty shall be one (1) year parts and labor.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents