Similar Projects
HMA Surface Removal
Post-Bid
Wood Dale, IL

2021 Water Supply Scada PLC Upgrades
Post-Bid
Naperville, IL 60563

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Paving
Results
Clarendon Hills, IL

Alley Reconstruction - Section D
Post-Bid
Westmont, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

2021 Frontier Sports Complex West Asphalt Trail
Post-Bid
Naperville, IL

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

I-19-4449 I-294 Roadway and Bridge Widening and Rehabilitation
Post-Bid
Downers Grove, IL

2021 Street Resurfacing ST-004(B)
Results
Downers Grove, IL

2021 Road Construction Season
Infrastructure
Post-Bid
Lisle, IL

2021 Sidewalk and Curb Maintenance Program
Results
Naperville, IL

Last Updated 10/06/2022 04:08 PM
Project Title

Fair Meadows Subdivision Rehabilitation Project

Physical Address View project details and contacts
City, State (County) West Chicago, IL 60185   (DuPage County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $1,447,325 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, water main installation, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. Minorities and women owned businesses (MBE/WBE) are encouraged to submit bids on this project. Bids shall be accompanied by a bid deposit in the amount of 5% of the bid. Bid bond shall be in the form of a bid bond (IDOT form 12230 or equal), certified check or cashier's check drawn on a responsible bank doing business in the United States and shall be made payable to the City of West Chicago. All bids not accompanied by a bid deposit will be rejected. The successful bidder shall furnish a Performance Bond and a Labor-Mechanical Payment Bond, both in the amount of one hundred percent (100%) of the bid amount as a security for the faithful performance of this contract and as a security for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this Contract, respectively. No bidder may withdraw his/her bid after the scheduled closing time for a period of ninety (90) days. This project is partially funded by the Community Development Block Grant funds. Successful bidder will be required to follow all grant requirements. The City reserves the right to reject any and all bid proposals, to waive any informality in any bid proposal, to re-advertise the proposed services, and to accept the proposal most advantageous to the City. The work as shown on the plans and as specified herein contains quantities for intermittent sidewalk removal and replacement. The project is located throughout the City of West Chicago, with the majority of the project's improvements located within residential neighborhoods. The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. All quantities, unless noted otherwise, will be used in determining the lowest responsible bidder. The ENGINEER reserves the right, during construction, to alter the locations and/or quantities in the "Summary of Quantities".

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents