Similar Projects
Rehabilitation of Linings and Coatings of Sierra East and Sierra West Above Ground Storage Tanks
Post-Bid
Pittsburgh, PA 15123

Mixed-Bed De-ionization (DI) Systems
Post-Bid
Tobyhanna, PA 18466

New Water Storage Tank Project
Results
Clymer, PA 15728

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

J--DA Tank Isolation Valve Install Coatesville VAMC
Post-Bid
Coatesville, PA 19320

Junction Wastewater Treatment Plant Chlorine Contact Tank Rehabilitation
Results
Lewistown, PA 17044

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

UST Removal at Maintenance Area
Results
$25,000 to $50,000 est. value
Derry, PA 15627

0.25 MG Hillcrest Elevated Tank
Results
Lansdale, PA 19446

Frontier Garage-Underground Storage Tank Modifications
Results
Conshohocken, PA 19428

Bunker Hill Water Storage Tank
Results
Central City, PA 15926

Design and Installation of Structures to Provide Access Over Existing Potable Water Filter Tanks
Results
Less than $62,700 est. value
Williamsport, PA 17701

SCI Rockview-Site Amenity and Infrastructure Improvements
Results
Less than $1,792,000 est. value
Pleasant Gap, PA 16823

Rehabilitation of the Lane Avenue Standpipe
Term Contract
Results
Phoenixville, PA 19460

Underground Storage Tank Removal
Results
Pittsburgh, PA 15207

Reported 10/22/2020 12:00 AM
Project Title

Hoover Water Storage Tank Replacement Project

Physical Address View project details and contacts
City, State (County) Bedford, PA 15522   (Bedford County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $950,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of an existing 500,000-gallon, water storage tank with a new 503,000-gallon, glass-fusedto-steel, water storage tank, the installation of a separate inlet and outlet piping system, upgraded telemetry system, and the installation of a trihalomethane (THM) removal system. The new tank will be installed on the same site and location as the existing tank which will be taken out of service, drained, and demolished prior to construction of the new tank. The scope of work will also include the installation of all on-site piping, valves, and appurtenances necessary to facilitate the operation of the tank and all associated accessories.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents