Similar Projects
Dunham Pointe, Section 11 Water Distribution, Sanitary Sewer, and Storm Sewer Facilities
Infrastructure
Bidding
$1,400,000 CJ est. value
Houston, TX 77003

Dunham Pointe, Section 11 Water Distribution, Sanitary Sewer, and Storm Sewer Facilities
Infrastructure
Bidding
$1,400,000 CJ est. value
Houston, TX 77003

Mechanical Electrical and Plumbing Service
Term Contract
Post-Bid
Houston, TX

2022 FRP MEP Project
Alteration
Post-Bid
$3,000,000 est. value
Spring, TX

Outsourced Plumbing and Repair Service
Term Contract
Results
Deer Park, TX

2022 Multi - Campus MEP Renovations
Alteration
Results
$13,000,000 est. value
Humble, TX 77396

Mechanical, Electrical, and Plumbing Service
Alteration
Post-Bid
Houston, TX

Centrifuges 69th Street Purchase and Installation
Renovation
Results
$4,388,000 CJ est. value
Houston, TX 77011

Plumbing Supplies and Materials
Term Contract
Post-Bid
Houston, TX

2022 Sanitary Sewer Rehabilitation
Infrastructure
Results
$63,850 CJ est. value
Katy, TX 77493

Maintenance Supplies, Equipment and Services
Term Contract
Post-Bid
Waller, TX

Construction of the Water Reuse Distribution System Modifications to Serve Fort Bend County Levee Improvement District No. 7
Infrastructure
Results
$724,420 CJ est. value
Houston, TX 77002

Plumbing Services
Term Contract
Post-Bid
TX

Water Distribution, and Sanitary Sewer Facilities to Serve Sentinel Capital
Infrastructure
Results
$377,806 CJ est. value
Houston, TX 77020

Harris County Utility District No. 6 - Water Plant No. 1 FEMA Replacement and Mitigation
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Houston, TX 77002

Last Updated 06/30/2023 11:16 AM
Project Title

Saint Tropez Lift Station No. 1

Physical Address View project details and contacts
City, State (County) Houston, TX 77020   (Harris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,155,750 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing the necessary labor, materials, equipment and supervision, and plant to construct Saint Tropez Lift Station No. 1 including but not limited to, mobilization, bonds and insurance; construction of an eight-foot (12') diameter cast-in-place concrete wet well including 100% solids epoxy coating, complete with three (3) submersible pumps, riser piping, valves, and coatings; fence and gates; site work; concrete pavement; on-site sanitary sewer piping; on-site storm piping; grate inlet; well pointing and dewatering as necessary; manhole; on-site force main; water line and RPZ backflow preventer with enclosure; electrical, grading, automatic transfer switch; load bank testing; lift station control panel; diesel generator; electrical service; lighting; disconnect switches; conduit; wire; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning facility. Final Completion shall be achieved within 30 calendar days from the date of Substantial Completion. In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. All questions shall be submitted at www.civcastusa.com through the question and answer section. Questions will not be considered after 3:00 p.m., three (3) calendar days prior to bidding.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents