Similar Projects
Last Updated | 06/15/2021 08:59 AM |
Project Title | Barracks Building 2008 Renovation |
Physical Address | View project details and contacts |
City, State (County) | Starke, FL 32091 (Clay County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $225,000 to $250,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remodel Barracks 2008 per plans and specifications from Akel, Logan, Shafer. Exterior: Install 4”x36” high split face concrete block wainscot with associated foundation and cap around perimeter of building. Clean and prepare existing block walls for wainscot and stucco Fur out wall even with adjacent concrete block wall if necessary. Install stucco from top of new cap to soffit. Replace all exterior doors with Solid Core Steel doors and new Best Lever Handle Hardware and Cores per CBJTC criteria. Remove existing screen doors. Replace all windows with new vinyl framed, fixed, insulated, low-e windows. Install flashing under windows over the precast cap. Remove existing monitor/clerestory roof structure plus entire existing asphalt shingle system. Close up opening where clerestory was removed and install new standing seam metal roofing system. Interior: Remove all existing interior walls and finishes down to wall structure, to include doors, frames and thresholds, ceilings light fixtures, power outlets, and mechanical system. Furnish and install spray foam insulation to the bottom of the existing roof deck, minimum R30 or higher. Install 1 5/8” metal framing on inside of exterior walls. Install 1 ½” rigid foam insulation, and 5/8” GWB. Finish will be level 5. Install new GWB on ceiling in mechanical room, acoustical ceiling in remainder of building. Install new lighting. Install new receptacles and data provisions. Replace existing A/C system and ductwork with new. Remove all existing flooring and level floor. Furnish and install new Hollow Core Steel doors and frames at both interior door locations. Provide lockset in accordance with CBJTC design criteria. Furnish and install new solid surface window sills, to be approved by CBJTC. Furnish and install 2” white plastic window blinds. |
||||||||||||||||||||||||||||||||||||
Details | Military Facility, Renovation.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |