Similar Projects
York Road (LS-10) and Thomas Foster (LS-15) Lift Station Improvements
Bidding
Bensenville, IL 60106

Main Street and Organ Street Pumping Station Rehabilitations
Renovation
Bidding
Eldorado, IL

Levee 37 Pump Station Upgrade (USACE Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Mount Prospect, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Check Valve Replacement
Results
Gurnee, IL 60031

Lift Station Upgrade
Results
$25,000 to $50,000 est. value
Greenup, IL 62428

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Utilities Lift Station Pump Replacements 2021
Bidding
Joliet, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Force Main Improvement - Lift Station 23 and 25A
Results
Edwardsville, IL 62025

Chasemoor Lift Station Rehabilitation
Renovation
Bidding
Burr Ridge, IL 60527

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Oswego Pump Station Phase 2 Improvements
Results
Oswego, IL 60543

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Various Repairs at Pavilion Lift Station
Results
Oakwood, IL 61858

Last Updated 11/11/2020 01:52 PM
Project Title

Lift Station No. 14 Replacement

Physical Address View project details and contacts
City, State (County) Mount Vernon, IL 62864   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a replacement triplex pump station, valve vault, electrical controls, telemetry, new generator, 18" diameter force main and associated site piping.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents