Similar Projects
Nottingham Park Improvements
New Construction, Infrastructure - 3,400 SF
Design
$10,000 CJ est. value
Avon, CO 81620

Forest Road / Multi Residential, Lot 2, Block 1, Vail Village Filing 3
New Construction
Design
$2,300,000 est. value
Vail, CO 81657

Donovan Park Landscape Modifications
Infrastructure
Bidding
$500,000 CJ est. value
Vail, CO 81657

Vail Bighorn Road Bus Turnaround Project
Infrastructure
Bidding
$200,000 CJ est. value
Vail, CO 81657

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Midland Avenue Streetscape Project
Infrastructure
Post-Bid
Basalt, CO 81621

Swift Gulch Employee Housing Project
New Construction
Results
Avon, CO 81620

Spring Creek Village
New Construction - 214,996 SF
Construction
Gypsum, CO 81637

Employee Housing Project
New Construction
Pending Verification
Avon, CO

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

East Vail Multi Residential
New Construction
Design
$17,000,000 est. value
Vail, CO

Milk Creek Timber Bridge Deck Replacement
Infrastructure
Bidding
$25,000 CJ est. value
Wolcott, CO 81655

Midland Avenue Streetscape Project - Town of Basalt
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Basalt, CO 81621

Willits Condominium Development
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Basalt, CO 81621

2022 Dog Park at Buckhorn Valley
Infrastructure
Design
$180,000 CJ est. value
Gypsum, CO 81637

Last Updated 09/09/2022 01:34 PM
Project Title

Lionshead Place / Multi-Residential

Physical Address View project details and contacts
City, State (County) Vail, CO 81657   (Eagle County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for converting H14 and H15 units into one dwelling-unit and two accommodations units. As of September 9. 2022, this project's plans were approved by the City of Vail on April 11, 2022. However, applicant has not submitted any building applications with the city yet. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents