Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

Town-Wide Sidewalk Saw Cutting Project
Infrastructure
Bidding
Chapel Hill, NC 27516

Flood Mitigation Project
Infrastructure
Bidding
Less than $300,000 est. value
Wilmington, NC 28401

Bowles Parking Lot S-11 Sinkhole Repair
Post-Bid
Chapel Hill, NC 27599

Sidewalk Improvements for Monroe Street
Post-Bid
Salisbury, NC 28114

Wilson Street Sidewalk
Results
Wingate, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Entrance and Surface Parking Improvements
Construction
Hendersonville, NC 28791

North Tryon Street and 36th Street Streetscape Project
Infrastructure
Bidding
$4,590,940 est. value
Charlotte, NC 28206

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Kincaid Avenue Sidewalk and Accessibility Improvements
Results
Wilson, NC

Kilborne Drive Streetscape
Infrastructure
Bidding
$2,943,000 est. value
Charlotte, NC 28205

Sidewalk System Work
Post-Bid
Concord, NC 28026

Briarcliff Road Area Sidewalk Improvements
Results
Less than $4,779,750 est. value
Mooresville, NC

Last Updated 07/27/2021 09:24 AM
Project Title

Jonesville Greenway Trail Repairs

Physical Address View project details and contacts
City, State (County) Jonesville, NC 28642   (Yadkin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To repair damage along the Jonesville Greenway Trail including the Gregory K. Martin Memorial Park located along the Yadkin River and beginning at the end of Plaza Street. The project requires the removal and disposal of debris, hauling of suitable fill material and rock to site, re-establishing trail with suitable fill material and rock, reseeding of grass, re-establishing riverbank area along Yadkin River, re-establish bridge support structures.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents