Similar Projects
Data Center
New Construction
Conception
Bristow, VA 20136

Potomac Technology Park Data Center
New Construction - 1,000,000 SF
Conception
$300,000,000 est. value
Manassas, VA 20112

Williams Mixed Use Development
New Construction, Infrastructure - 45,630 SF
Design
$24,500,000 CJ est. value
Haymarket, VA 20169

Riverside Station Phase 1
New Construction, Infrastructure - 40,000 SF
Design
$135,000,000 CJ est. value
Woodbridge, VA 22191

RFP D/B - State-of-the-Art Municipal Solid Waste Sorting Facility
New Construction, Infrastructure
Bidding
$25,000 CJ est. value
Woodbridge, VA 22191

Water Main Replacement Program Package 2 - P8 & P13
Infrastructure
Bidding
$200,000 CJ est. value
Woodbridge, VA 22191

AutoZone #6893 / Woodbridge
New Construction, Infrastructure - 6,500 SF
Post-Bid
$1,500,000 CJ est. value
Woodbridge, VA 22192

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Subgrade Stabilization
Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Independent Hill Village Mixed Use
New Construction, Infrastructure - 219,000 SF
Pending Verification
$111,000,000 CJ est. value
Manassas, VA 20112

Village Place @ Gainesville Technology Park - Data Center Development
New Construction, Build-Out - 1,190,000 SF
Pending Verification
$10,000,000 CJ est. value
Gainesville, VA 20155

Dar Al Noor Mosque Expansion
Addition, Demolition, Infrastructure, Renovation
Conception
$15,000,000 CJ est. value
Manassas, VA 20112

Potomac Heritage National Scenic Trail - Prince William County
Infrastructure
Design
$2,100,000 CJ est. value
Woodbridge, VA 22192

Auto Mitsubishi Dealership -Sitework
Alteration
Post-Bid
Manassas, VA 20111

Last Updated 09/29/2022 01:01 PM
Project Title

Prince William County Data Center Development

Physical Address View project details and contacts
City, State (County) Manassas, VA 20109   (Prince William County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Communication Building, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,700,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a large scale data center development. Phase one, a 700,000-square-foot building, is currently under construction. A timeline for future phases has not been determined. As of September 2022, the land acquisition phase is complete. The site plan was approved by the County of Prince William in 2020. The project is in the development stages. A flood hazard use permit is under review. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4,000,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents